WCPSS Logo

Tag: Best practices

Your search found 104 reports. Refine your search.

If you need assistance finding a specific report, please contact wcpss-data-accountability@wcpss.net.

Published Document Title Authors Pages Abstract
December 2023 Blended and Virtual Learning: A Research and Evaluation Series July 2020 - December 2023 Bulgakov-Cooke, Dina
Paeplow, Colleen
Rhea, Anisa

95 View Abstract

In July 2020, the Data, Research, and Accountability (DRA) Department began investigating blended learning environments, which consist of a combination of virtual learning and face-to-face instruction. This inquiry was partly in response to the COVID-19 pandemic which prompted transitions across school districts nationwide. More importantly, Wake County Public School System (WCPSS) leadership recognized that blended learning would continue to be an important instructional delivery method that required an empirical understanding. Thus, to inform district decisions around future quality blended learning implementation, DRA has written five short reviews covering different aspects of this topic.

Full Report (HTML)

October 2021 A Brief Look at Early School Start Times Scrimgeour, Meghan

13 View Abstract

This literature review is intended to provide an overview of the current research literature on the effects of early secondary school start times on student outcomes and to help inform decisions regarding options for future Wake County Public School System (WCPSS) start times. Even though research shows that getting sufficient sleep is critical for all students, sleep deprivation is prevalent among American adolescents. Early school start times are one of the primary hurdles secondary students face to getting enough sleep. As states and districts across the country deliberate adjusting school start times, current research suggests that pushing back secondary school start times (i.e., starting later) is an effective counter measure to combat sleep deprivation and to positively impact students’ sleep patterns, physical and mental health, safety, and academic outcomes.

Full Report (PDF)

April 2017 Effective Teaching Framework (ETF): 2015-16 Baenen, Nancy
Jackl, Andrew
Regan, Roger

30 View Abstract

The Effective Teaching Framework (ETF) initiative was designed to provide a common language and lens for understanding the skills, strategies, and resources needed for teachers and school leaders to create an optimal learning environment for all students. ETF training consisted of six full days of training for principals, assistant principals (APs), and selected Central Services staff, as well as an abridged version (24 hours) for Instructional Resource Teachers (IRTs). Beginning and mentor teachers also received some training. Training was provided to all cohorts as planned. Generally, the training sessions were well-attended and highly-rated by the participants; in 2015-16, 92.7% agreed it helped them become more effective in their roles. The trainings were supplemented by an ETF website that provided a wide range of online resources. However, the website was underutilized, with only 26.3% of teachers indicating that they used the website to improve their teaching. In most cases, implementation of ETF was limited to individuals applying their learning to classroom observations and teacher evaluations. Based on focus group interviews with APs, barriers to school-wide ETF efforts included: a) confusion about expectations for orchestrating an ETF “rollout” at their schools, b) lack of communication and follow-up from Central Services staff, c) leadership changes, d) lack of communal training and planning time among the schools’ administrative teams, and e) lack of grassroots support for the initiative at the school level. While training quality was high, building stronger buy-in before implementation, communicating clearer expectations, and implementing structures to support long-lasting roll-outs at the school level are recommended.

Full Report (PDF)

February 2016 Teacher Incentive Fund Program at Wilburn Elementary School, Final Evaluation Baenen, Nancy
Germuth, Amy

40 View Abstract

Wilburn implemented the Teacher Advancement Program (TAP) from 2008-09 through 2014-15. TIF funding supported the performance pay component since 2010-11. All TAP principles were implemented. However, challenges occurred related to staff turnover, scheduling, and the extra work involved. Many teachers did not find the TAP model very helpful. The TAP rubric and model lessons (with coaching) were considered the most positive aspects. Relative to the comparison schools, the pattern of K-2 literacy results was mixed for 2013-14 and somewhat stronger in 2014-15. Wilburn also showed similar patterns for the percentage of students scoring proficient on the EOG from 2007-08 (before TAP) to 2011-12 and 2012-13 to 2014-15 (with the revised EOG). Wilburn’s growth results on EVAAS were at or above state expectations each year except for grade 4 in both subjects in 2015. Results were similar to comparison schools (with somewhat stronger results in 5th grade math). Overall, Wilburn achievement results have not been consistently stronger with TAP compared to similar schools without TAP. The cost/benefit of the model was not clearly favorable.

Full Report (PDF)

March 2015 Limited English Proficient Students: Progress of Kindergarten Cohorts Baenen, Nancy
Huebeler, Amy

60 View Abstract

We examined the progress of kindergarteners who entered the Wake County Public School System (WCPSS) in 2008-09 and in 2010-11 who were identified as limited in English proficiency (LEP). For the 2008-09 cohort, English proficiency increased steadily over time. Few were able to exit LEP status in their first three years in WCPSS (10.5%); this jumped to 44.5% after four years. Retention rates were higher than for other subgroups, but declined from kindergarten to grade 3. Proficiency on the grade 3 Reading End of Grade (EOG) exam for the full LEP cohort was below that of WCPSS (50.4% vs. 69.6%). Those who exited LEP status before grade 3 had higher proficiency than the district on the EOG, and those exiting in grade 3 came close to district proficiency percentages. Patterns were similar for the 2010-11 cohort. A qualitative comparison of schools with the most and least success in improving literacy between kindergarten and second grade revealed the more successful schools served fewer LEP students, had fewer ESL teachers, and had traditional or modified calendars. They tended to provide more time for ESL instruction to newcomers and transitional students, had greater collaboration between ESL and classroom teachers, promoted community involvement more proactively, and exposed LEP students to more grade level materials (higher expectations).

Full Report (PDF)

May 2013 Formative Assessment with Technology 2011-12: Second Year of Implementation Bulgakov-Cooke, Dina
Talbot, Troy

30 View Abstract

The second year (2011-12) of the Formative Assessment with Technology Project in three WCPSS schools was studied to determine the fidelity of implementation of the formative assessment practices and the project's impact on student achievement. Classroom observations and surveys of teachers and students showed that implementation was moderate, and it varied widely across teachers. Certain targeted practices were reported or observed much more often than others. High turnover in the teachers participating in the project likely contributed to the uneven implementation. High school staff had the highest level of implementation of training concepts as well as the highest use of the electronic response tools for assessment. Full implementation and impact on state achievement test scores was expected to take two years to be evident. Since only nine teachers participated and had data for two years, impact could not be reliably assessed. This pilot training model would be too expensive to roll out district-wide in WCPSS. More cost effective models may be used to encourage appropriate use of formative assessment.

Full Report (PDF)

May 2013 High Five PLT Survey Results, 2007-08 to 2012-13 Jackl, Andrew

20 View Abstract

WCPSS PLT survey responses have been positive over time, remaining at high levels for the past six school years. Analyses of High Five PLT Survey data from 2007-08 to 2012-13 show: The percentage of positive agreement to each of the High Five PLT Survey themes increased between 4 and 11 percentage points since baseline data was first collected in the 2007-08 school year. When the survey data were disaggregated by the six PLT themes, only "collaborative culture/team processes" showed a decline (two percentage points). When the survey items are examined individually, the percentage of respondents marking that they "strongly agree" almost universally decreased from 2011-12, while the percentage marking "agree" showed a corresponding increase. Administering the High Five PLT Survey at less frequent intervals is recommended, as well as standardized PLT training for all new staff.

Full Report (PDF)

March 2013 Evaluation of the Teacher Incentive Fund (TIF) Program: Wilburn Elementary School, Year 2 2011-12 Baenen, Nancy

30 View Abstract

Wilburn was in its fourth year of implementing Teacher Advancement Program (TAP) in 2011-12, which is designed to attract, retain, and motivate quality teachers and increase student achievement. It was in the second year of TIF funding to provide performance pay for improved student performance. Analysis of EOG reading and math test scores for 2011-12 showed increases in student performance (where different cohorts of students are compared over time) and growth (when a student is compared to him- or herself over time). All staff earned some performance pay based on the TAP model formulas (unlike the previous year). Recommendations are to provide more ways for teachers to share their perceptions of TAP, to start observations earlier in the year, and to improve training by focusing on the application of the rubric and differentiating training (for teachers new to TAP and those with experience).

Full Report (PDF)

July 2012 High Five PLT Survey Results, 2007-12 Jackl, Andrew

20 View Abstract

Summary - WCPSS PLT survey responses have been positive over time, reaching a high plateau for the last three years. Analyses of High Five PLT Survey data from 2007-12 show: In 2011-12, high percentages (87.2%) of WCPSS teachers responding to the High Five PLT Survey provided positive responses to the items. Responses have been positive from 2007-08 to 2011-12, with small increases over time. Overall, WCPSS has shown an improvement in its PLT Performance Index of 5.7 percentage points over five years. The elementary, middle, and high schools have shown gains of 4.2, 7.5, and 9.1 percentage points, respectively. The implementation of dedicated time for PLT work (Wake Wednesdays) correlated to slight increases in PLT indices at the elementary and middle school levels; only the elementary level saw a slight decline when dedicated time was no longer provided.

Full Report (PDF)

April 2012 Wake County Public School System (WCPSS) Professional Learning Teams (PLTs): 2010-11 to 2011-12 School-Based Policy Study Jackl, Andrew
Lougée, Aimee

38 View Abstract

Professional Learning Teams were first introduced in WCPSS in 2003. Implementation checks, first done in 2007-08, showed most teachers (81.5%) reported involvement in PLT work. These high percentages improved slowly over time, with 87% positive responses to items by fall of 2011. In terms of impact, 81% of teachers indicated students learned more because of their PLT work. Student retention rates, classroom grades, state test performance, and graduation rates have all improved over time. Regression analyses indicated those schools who utilized PLTs the most had greater decreases in student retention rates than those with lower implementation. Similar analyses for student growth on test results just missed statistical significance. While it is difficult to separate out the impact of PLT work from other initiatives, these analyses suggest PLTs have contributed to improvements in WCPSS outcomes despite tough economic times and increasing challenges for teachers.

Full Report (PDF)

December 2011 District Improvement Outcomes: 2010-11 Paeplow, Colleen

38 View Abstract

In 2010-11, Wake County Public School System (WCPSS) was in district-wide improvement as a result of failing to meet Adequate Yearly Progress (AYP) in mathematics at the district level for the second consecutive year. This report examines overall student outcomes in 2010-11 as well as overall teacher outcomes and longitudinal results for schools targeted for three consecutive years of SIOP® training and support compared to matched schools who were not involved. SIOP® schools had a greater increase in students reaching growth targets than in the district overall. Increases in reading and mathematics proficiency at SIOP® elementary schools and reading at SIOP® middle schools were similar or slightly higher than for WCPSS. Overall mathematics results were not positive for SIOP® middle schools; however, matched school analysis by subject and school level found targeted student subgroups (i.e., Hispanic/Latino and Black/African American, Limited English Proficient, and economically disadvantaged) did benefit from attending SIOP® targeted schools. 2010-11 represented the first year of implementation of the Secondary Literacy and Secondary Mathematics Initiatives. The demographic similarity of schools implementing Secondary Mathematics with WCPSS coupled with the weak results indicates, as with Secondary Literacy, the results of this initiative could be strengthened by more selective process of targeting schools to receive training.

Full Report (PDF)

December 2011 WCPSS District Improvement Implementation 2010-11 Baenen, Nancy
Bulgakov-Cooke, Dina

94 View Abstract

Instructional strategies aimed at improving achievement of low performing student subgroups in need of support were selected by the District Improvement Advisory Committee, so that WCPSS could exit District Improvement status. Impact of each initiative, which often included teacher training and coaching is examined in this implementation report. Recommendations are made including setting strategic goals and systematically monitoring implementation; targeting schools or teachers with high numbers of AYP groups of students in need of support; being intentional in coaching efforts and structuring coaching models based on the SIOP® experience; building ownership and commitment at the school level; and coordinating new and existing efforts to optimize effectiveness.

Full Report (PDF)

August 2011 Evaluation of WCPSS Central Services Professional Learning Teams (PLTs): Spring 2011 Jackl, Andrew

39 View Abstract

The Wake County Public School System (WCPSS) Board policy indicates that central staff are to support school implementation of Professional Learning Teams (PLTs) and to participate in PLTs at the central level. Central Services supported PLT work in the schools in a variety of ways. The percentage of principals who saw this support as adequate dropped from 85% to 70% between spring 2010 and 2011. Within Central Services, 86% of survey respondents reported participating in at least one PLT. Of those responding to the Spring 2011 PLT survey, responses remained overwhelming positive about implementation and effectiveness. However, without exception, the strength of agreement decreased, with the percentage of respondents who "strongly agreed" dropping between 2010 and 2011.

Full Report (PDF)

August 2011 Student Achievement in WCPSS, 2010-2011 McMillen, Brad

703 View Abstract

Student Achievement in WCPSS, 2010-2011

Full Report (PDF)

July 2011 Teacher Advancement Program (TAP) at Wilburn Elementary School: Year 3 Evaluation Report Baenen, Nancy

21 View Abstract

The Teacher Advancement Program (TAP) is a model for training, teacher advancement, and instructional strategies. Based on interviews and observations, the four TAP principles were implemented with fidelity during the 2010-11 school year, with one exception--teacher evaluations. Feedback was slow, and teachers had concerns about the reliability of the ratings. The impact on teachers was negative. Compared to 2009-10, reading and math proficiency improved in grades 3 and 5 in 2010-11 but not grade 4. However, compared to proficiency before TAP began, only Grade 5 had improved reading proficiency and none of the grades (3, 4, and 5) had higher proficiency in math. Grade 4 had positive trends for Academic Change (growth) in both reading and math.

Full Report (PDF)

July 2011 Title I Preschool Program in the Wake County Public School System (WCPSS): Short- and Long-Term Outcomes Baenen, Nancy

22 View Abstract

The longitudinal study of the 2005-06 preschool in WCPSS found short-term gains during the preschool year, but limited impact by kindergarten and no average impact by the end of 3rd grade on achievement, retention rates, special education placements, or attendance. Small sample sizes limit conclusions that can be drawn; a larger study with a stronger research design is recommended for next year. The larger 2010-11 preschool program provided strong evidence of short-term gains on achievement after the preschool experience. Teachers and parents were generally satisfied with the program. Teachers suggested higher student attendance and greater parent involvement would be helpful. Teachers used Creative Curriculum materials with varying frequency; they also viewed some components of the curriculum as more effective than others.

Full Report (PDF)

June 2011 Comprehensive Assessment Systems: Purposes and Implementation Talbot, Troy

13 View Abstract

Comprehensive Assessment Systems: Purposes and Implementation

Full Report (PDF)

April 2011 Assessing the Value of the Arts: Looking Beyond Traditional Achievement Measures Baenen, Nancy
Brasfield, Jon

13 View Abstract

Courses in the arts develop skills specific to the discipline. Research also suggests that the arts contribute to enhanced attentiveness, engagement in school, communication skills, and critical and divergent thinking. Other studies point out benefits for at-risk students in reducing negative outcomes such as dropout and crime rates. Studies report a correlational relationship between arts education and reading achievement, but a causal link has not been established. Thus, there is evidence of benefits of the arts that can support students' success in school, but more high quality causal studies are needed.

Full Report (PDF)

April 2011 WCPSS 2010-11 High Five Professional Learning Teams (PLT) Survey Results: Implementation Over Time Jackl, Andrew

36 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Teams (PLTs) as a research-based method of improving teacher effectiveness and increasing student achievement. Over each of the last four years, a survey of educators was conducted in WCPSS and the other four High Five districts. As in previous years, this year's data showed strong support among teachers for the PLT model; between 73% and 91% of respondents indicating that they "strongly agree" or "agree" with the statements pertaining to the six PLT themes. Viewed longitudinally, positive responses for each theme have increased between four and eight percentage points since 2007-08. When 2010-11 results were compared with 2009-10, the results were less dramatic, with smaller changes in the percentage of positive responses.

Full Report (PDF)

January 2011 ABCs and AYP Results, WCPSS: 2009-10 Haynie, Glenda

9 View Abstract

In 2009-10, 92% of WCPSS schools met Expected or High Growth as measured by the North Carolina ABCs program, a 3.5 percentage point increase from 2008-09. Fifty-four percent of the schools made High Growth and 38% made Expected Growth. All subgroups saw their percentages of students meeting growth increase to above 55% in 2009-10; with the "All Students" group above 60% (the state's definition of High Growth for a school). Slightly more than 90% of WCPSS schools were in the recognition categories Honor Schools of Excellence (5.8%), Schools of Excellence (3.2%), Schools of Distinction (40.6%), or Schools of Progress (40.6%). Yet there was a substantial decrease in the number of schools making AYP (38.4%) compared to 2008-09 (62.8%). The decrease in 2009-10 can partly be explained by the one-year effect of retests that benefitted schools in 2008-09, and the invalidation of tests for high school occupational course of study students by the U.S. Department of Education. There were a much greater proportion of schools that met High Growth among the schools that met AYP (71.7%) than among those that did not meet AYP (43.2%).

Full Report (PDF)

January 2011 Academy of Reading® (AoR) 2008-09 and 2009-10 Evaluation Baenen, Nancy
Lougée, Aimee

68 View Abstract

Academy of READING (AoR) is designed to improve students' foundational reading skills; it is used in almost all Wake County Public Schools (WCPSS) secondary schools. Central staff recommended students with prior End of Grade/Course (EOG/EOC) scale scores placing them high in Level II or low in Level III have first priority for service; many students served scored below this range (second priority). Program completion rates increased from 2008-09 (26%) to 2009-10 (41%), but were still considerably lower than desired (100%). Growth for 2009-10 AoR participants on End of Grade reading/English tests was strong (with the percentage of students reaching their growth targets increasing from 37.5% before service to 60.1% afterwards). This improvement is educationally important. Program completion gave students only a slight advantage in terms of EOG growth. The program appeared to be helpful, with patterns generally favoring middle school over high school students.

Full Report (PDF)

November 2010 WCPSS Professional Learning Teams (PLTs): 2009-10 School-Based Policy Implementation Study Baenen, Nancy

122 View Abstract

As a result of Board Policy 3610, PLTs were implemented across WCPSS in a consistent fashion in 2009-10. Data show that implementation improved and teachers spent more time engaged in collaborative work. School staff cited numerous benefits for teachers and students. Regression analyses showed a reasonably strong correlation between high levels of PLT implementation and students' academic achievement, attendance, and their overall level of satisfaction with their schools. Essential characteristics of PLTs were illustrated in case studies of high-performing PLTs' in the district. While collaborative cultures have been well-established, most teams could benefit from additional training on ways to use data, and on ways to evaluate the success of their efforts. Communications with school communities could also be more consistent across schools.

Full Report (PDF)

November 2010 Year 3 Magnet Schools Assistance Program Annual Progress Report Brasfield, Jon
Cárdenas, Virginia

76 View Abstract

The three MSAP schools; East Garner International Baccalaureate Magnet Middle School (EGMMS), Garner International Baccalaureate Magnet High School (GMHS), and Southeast Raleigh Leadership and Technology Magnet High School (SRMHS) showed progress on MSAP performance measures during the 3rd year of the grant. Data on 16 performance measures collected relate to "Desegregation and Choice" (6), "Building Capacity" (2), and "Academic Achievement of Students" (8). Overall, half the targets were met, with the most variability across schools for the Desegregation and Choice measures. Observations and survey results revealed increased efforts to implement innovative educational methods and programs at all three MSAP schools. Each school established strategic processes to address targets in each goal area. Although progress was made, much work remained to be done to achieve the original goals of the MSAP grant. The district requested and received a no-cost extension to run through the 2010-2011 school year.

Full Report (PDF)

September 2010 WCPSS District Improvement: 2009-10 Implementation Status Bulgakov-Cooke, Dina

46 View Abstract

In 2009-10 Wake County Public Schools System (WCPSS) exited District Improvement in reading and remained in level one for mathematics. All District Improvement efforts gained momentum. The Sheltered Instruction Observation Protocol (SIOP®) continued as the primary focus to meet the needs of limited English proficient (LEP) students in elementary and middle schools. The high school component was modified and addressed both literacy and mathematics. The number of trained SIOP® teachers considerably increased (from 588 in 2008-09 to 956 in 2009-10), follow-up coaching to support application of training reached more teachers, training implementation and buy-in strengthened. All SIOP® training, coaching, and implementation objectives for in 2009-10 were met or partially met. The number and use of SIOP® modified focus lessons increased substantially, but awareness could still be improved.

Full Report (PDF)

June 2010 Effective Teaching Practices Haynie, Glenda

39 View Abstract

This paper reports the overall findings of research on effective teaching practices in Wake County Public Schools (WCPSS). It is a cross-case analysis of five earlier studies (Biology, Algebra I, U.S. History, middle school Algebra I, and English I). Despite subject implementation differences, four common themes were found: high academic expectations for all students, thoughtful management of time and materials, learning-centered classrooms, and proactive planning.

Full Report (PDF)

June 2010 End-of-Grade (EOG) Multiple-Choice Test Results, 2008-09 McMillen, Brad

28 View Abstract

In 2008-09, results from End-of-Grade (EOG) reading and mathematics tests in WCPSS continued to demonstrate an upward trend across grade levels and student subgroups. Disaggregation of results by ethnicity, income level, disability status, and English proficiency status showed that achievement gaps between historically underperforming subgroups and their peers are still significant but are closing. Results of the new EOG science test in grades 5 and 8 showed that proficiency rates in science are below those for reading and mathematics. The effect of retesting for students who fail to score proficient on the first administration of EOG tests indicated that retesting improved proficiency rates by 4-9 percentage points, and that some groups of students benefited more than others from retesting.

Full Report (PDF)

June 2010 Evaluation of Central Services Professional Learning Teams as of Spring 2010 Baenen, Nancy
Jackl, Andrew

35 View Abstract

The Wake County Public School System (WCPSS) board policy states that central services staff are to support school implementation of Professional Learning Teams (PLTs) and to participate in PLTs at the central level. Central staff support school efforts in a variety of ways, and over 85% of principals at each level reported this support was adequate. Participation in PLTs among central staff respondents was high for those in administrative (86%) and professional and technical roles (76%), but lower for support staff (37%). High percentages of central administrators, professionals, and technical staff had positive views about PLT implementation and impact. Responses for those in administrative roles were almost always more positive in spring 2010 than in previous surveys. High percentages of administrators and professional/technical staff believe PLTs help them perform their job more effectively, along with most support staff (91%, 86%, and 67% respectively).

Full Report (PDF)

May 2010 WCPSS 2009-10 High Five PLT Survey Results: Professional Learning Team (PLT) Implementation Over Time Jackl, Andrew

40 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Teams (PLTs) as a research-based method of improving teacher effectiveness and increasing student achievement. High Five PLT Survey results from 2007-08 through 2009-10 showed a strong level of support for the PLT oncept. The 2009-10 results revealed 73% to 92% of the respondents agreed or strongly agreed with all statements pertaining to each of the six core PLT themes. Generally, teachers responded more positively to the survey items in 2009-10 than in previous years. The percentage of teachers meeting weekly for over an hour increased greatly over prior years after implementation of the Board policy on PLTs. In short, survey results suggest strong implementation, with slow but measureable progress towards full functioning of all components of the model.

Full Report (PDF)

April 2010 Your Child and the Kindergarten Initial Assessment Baenen, Nancy

2 View Abstract

Describes the Kindergarten Initial Assessment which all students are given as they enter kindergarten to assess their beginning skills. Also describes the kinds of skills that are helpful for students to have in kindergarten.

Full Report (PDF)

March 2010 Teacher Absences: Types, Frequency, and Impact on Student Achievement, Wake County Public School System, 2007-08 Speas, Carol

33 View Abstract

In 2007-08, the WCPSS teacher absence rate was 10.3 days, slightly higher than a national rate of 9.5 days in 2004-05 but lower than the 11.3 to 14.6 days reported in large school districts more recently. In comparison with other studies, WCPSS teachers averaged smaller proportions of personal and sick leave days, slightly more annual leave days, and a higher proportion of administrative leave days. Teacher absences varied by years of experience and by schools' grade span and proportion of students receiving free or reduced-price lunch. Overall, there is some evidence, low but significant, of a negative relationship between teacher absences and mathematics achievement in two of six grades, but not in reading or six high school courses. These and other findings, including screening and costs of substitute teachers, are detailed in this report.

Full Report (PDF)

January 2010 NovaNET 2008-09 Evaluation Bulgakov-Cooke, Dina

29 View Abstract

NovaNET is a technology-based teacher-facilitated educational approach used at schools to support students at risk of not meeting graduation requirements to accrue credits in a variety of subjects. NovaNET contributes to the WCPSS goal of closing achievement gaps and creating opportunities for all students to graduate on time. In 2008-09, 38 NovaNET courses were offered districtwide. All high schools offered credit recovery (CR) courses. Six schools offered remediation opportunities, and 11 offered new credits. Based on summer courses, NovaNET had a high success rate in helping students earn credits towards graduation. Based on high summer pass rates, it is recommended to encourage use of NovaNET to earn course credits, examine ways to enhance EOC performance, designate use of NovaNET within course codes, streamline reporting methods, and enhance monitoring of success. Consider expanded use of NovaNET as a supplement for regular courses. Based on cost-effectiveness, expand student access to NovaNET in summer if feasible.

Full Report (PDF)

January 2010 Test Scores and the Standard Error of Measurement Holdzkom, David
McMillen, Brad
Sumner, Brian

3 View Abstract

Test Scores and the Standard Error of Measurement

Full Report (PDF)

December 2009 Effective Teaching Practices in English I (Summary) Bowen, Kim
Haynie, Glenda
Merritt, Sherri

1 View Abstract

This study analyzed the instructional practices of the most effective English I teachers identified by a multiple regression model. Using both quantitative and qualitative analysis of test data, surveys, observations, and focus-group interviews, the study found that the goal of the most effective teachers was effective communication skills for all students. These teachers focused on building capacity in students by addressing transition into high school and success across all curricular areas. Their classrooms were well-managed and activity-based, using at least the middle level thinking skills of application and analysis. Most effective teachers used Marzano research-based strategies, particularly reinforcing effort and providing recognition, non-linguistic representation, and cooperative learning. These results can be used to motivate teacher and school improvement efforts.

Full Report (PDF)

October 2009 Accelerated Learning Program (ALP) Grades 3-5: Evaluation 2007-08 Baenen, Nancy
Lougée, Aimee

34 View Abstract

ALP 2007-08 was designed to primarily support Level I and II student below grade levels, with others supported as funds allowed. Evidence indicates many students scoring proficient were served (especially in literacy) while some students scoring below grade level received no documented support. ALP reached less than half of students scoring below grade level in literacy and in mathematics. Literacy achievement growth outcomes for Level I-II students below grade level were about the same as for other Level I-II students (many of whom received other services); ALP results were less positive for students who scored at grade level prior to service than for similar students. Mathematics proficiency results were less positive than for those served in other programs or not served. Achievement outcomes were similar for students served during the school day or outside of the school day.

Full Report (PDF)

October 2009 Year 2 Magnet Schools Assistance Program (MSAP) Brasfield, Jon

56 View Abstract

In Year 2 of the MSAP grant, significant progress was made by each school and its community to implement the grant objectives. Year 2 represented an amalgamation of Year 1 activities that were not implemented due to a delay in hiring key personnel, original objectives assigned to Year 2, and several activities that arose from improvement sessions. Each school had a blue print that captured their performance measures, target outcomes, yearly activities, staff development activities, and resources along with a customized yearly time line. The 16 performance measures were grouped into three categories. The "Desegregation and Choice" category was the most difficult for schools to attain (with three or four of the six measures met by each school). All schools achieved both "Building Capacity" performance measures. In the "Academic Achievement" category, SRMHS achieved 5/8 targets, GMHS achieved 4/8, and EGMMS achieved 6/7 (4-year graduation rate is measured for the two high schools, but not for the middle school). In all, SRMHS achieved the stated target on 10/16 performance measures, GMHS on 10/16, and EGMMS met 12/15.

Full Report (PDF)

June 2009 Algebra I Performance in Year-Long versus Semester-Long Courses Holdzkom, David

5 View Abstract

This study examined differences in student achievement between 9th grade students who took Algebra I in a twopart, year-long sequence and those who took a one-semester Algebra I course. Results indicated higher proficiency rates and higher growth results for students in the year-long sequence, especially for students who scored below Achievement Level IV on their 8th Grade Mathematics EOG test. Schools are urged to use these results to make data-based scheduling decisions for 9th grade Algebra I students.

Full Report (PDF)

June 2009 PLC Survey Results by Years of Experience Baenen, Nancy

13 View Abstract

On the High Five PLC Survey, most teachers, regardless of years of experience, viewed PLCs as having a positive impact on their work environment and student learning. Beginning teachers tended to have the highest percentage of agreement. The percentage of teachers agreeing that PLCs were having the desired impact increased between 2007-08 and 2008-09 for both beginning teachers and those with more experience. Thus, trends were in the desired direction.

Full Report (PDF)

May 2009 Professional Learning Community (PLC) Implementation: WCPSS 2008-09 High Five PLC Survey Results Jackl, Andrew

37 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Communities (PLCs) as a research-based method of increasing student achievement and improving teaching effectiveness. Teachers were surveyed in 2007-08 and again in 2008-09 to obtain data about the status of PLC implementation efforts within the district. The 2008-09 results showed a strong level of support for the PLC concept (71% to 89% of the survey respondents agreed or strongly agreed with statements pertaining to each of the six core PLC themes). In most instances, teachers responded more positively to the survey items in 2008-09 than they did the year before. In short, survey results suggest that the district is making progress towards its goal of full PLC implementation.

Full Report (PDF)

May 2009 WCPSS Assessment Item Bank Summary Report May 2009 Callipare, Amy

283 View Abstract

'The Wake County Public Schools' (WCPSS) Assessment Item Bank was surveyed to determine the current number of items and to help in developing future plans for the system. First, the Department of Public Instruction's (DPI) goals and objectives were compared to those listed in the WCPSS Assessment Item Bank. The number of items present in the WCPSS Assessment Item Bank was determined for each subject area, by grade and objective. The number of items in the WCPSS Assessment Item Bank was then compared to the state assessment numbers for each objective. This information was used to help determine the areas of need for future efforts to further expand the WCPSS Assessment Item Bank.

Full Report (PDF)

February 2009 Middle School Algebra I: Effective Instructional Strategies with Comparison to High School Practices Haynie, Glenda
McMillen, Brad

41 View Abstract

This study examined practices of teachers in Wake County Public Schools' (WCPSS) middle school Algebra I classes. Regression analyses of standardized state testing results allowed for identification of the most effective and least effective Algebra I teachers. The study used surveys, observations, and focus group interviews to compare and contrast most effective teachers with less effective teachers. It found that the most effective middle school algebra teachers held a significantly more positive attitude toward their students than did less effective teachers. They had high expectations for all students, used mathematics vocabulary appropriately, had a structured classroom management style, taught bell to bell using an invigorated pace, and had a classroom culture in which students were free to ask questions, contribute, and offer explanations. These results can be used to motivate teacher and school improvement efforts.

Full Report (PDF)

February 2009 North Carolina Virtual Public School in WCPSS Update for Fall 2007, Spring 2008, and Summer 2008 Baenen, Nancy
Bulgakov-Cooke, Dina

33 View Abstract

North Carolina Virtual Public School (NCVPS) has changed since summer 2007, with more traditional courses and fewer credit-recovery courses. Total NCVPS initial enrollments of Wake County Public School System (WCPSS) students were much lower in Fall 2007 (139), Spring 2008 (198), and Summer 2008 (430) than in Summer 2007 (1,378). Students were more likely to complete courses after Summer 2007. However, students enrolled in Fall 2007 and Spring 2008 were more likely to drop courses with failure after the deadline than to do so before the cutoff date. Percentages of final enrollments with passing NCVPS course grades increased from 47% in Summer 2007 to 64%, 84%, and 70% in the fall, spring, and summer, respectively. In Summer 2008, pass rates for EOC courses were somewhat lower than for other courses, with relatively low pass rates on EOC tests.

Full Report (PDF)

January 2009 Best Practices to Promote High School Graduation Baenen, Nancy

13 View Abstract

Significant attention and resources have been focused on reforming high schools to enhance graduation rates. The research literature supports the following practices: For struggling students, accurate identification and intensive instructional, monitoring, and counseling support For 9th graders, transition activities, personalization, and academic support strategies For teachers, intensive training to help them provide effective instruction and support, particularly for students showing signs of risk.

Full Report (PDF)

January 2009 Overview of Practices to Promote High School Graduation Baenen, Nancy

2 View Abstract

Significant attention and resources have been focused on reforming high schools to enhance graduation rates. The research literature supports the following practices: For struggling students, accurate identification and intensive instructional, monitoring, and counseling support For 9th graders, transition activities, personalization, and academic support strategies For teachers, intensive training to help them provide effective instruction and support, particularly for students showing signs of risk.

Full Report (PDF)

October 2008 Helping High-Performing Students Achieve at Higher Levels: A Review of the Literature Yaman, Kimberly

11 View Abstract

Helping High-Performing Students Achieve at Higher Levels: A Review of the Literature

Full Report (PDF)

June 2008 Standards-Based Grading 2005-06 and 2006-07 Paeplow, Colleen

26 View Abstract

Wake County Public School System (WCPSS) uses a standards-based grading policy at the elementary school level that aligns with North Carolina's Student Accountability Standards and the WCPSS Promotion/Intervention policy. This evaluation examined the distribution of grades given in 2005-06 and 2006-07 and the correlation of students' grades and End-of-Grade (EOG) scores in 2006-07. The study found that over three fourths of students were graded as proficient in reading and mathematics. In reading and mathematics grade K-2 students earned higher grades than their 3-5 counterparts; overall, mathematics grades were lower than reading across the K-5 grade levels. Fourth-quarter reading and mathematics grades were correlated with reading and mathematics' EOG scores. Mathematics grades had a stronger correlation to the newly revised mathematics EOG scores than did fourthquarter reading grades to the current reading EOG scores. Furthermore, a student scoring proficient within the classroom has a greater likelihood of being proficient on their EOG than those with below grade-level scores.

Full Report (PDF)

May 2008 WCPSS Professional Learning Communities: 2007-08 Implementation Status Reichstetter, Rosemary

62 View Abstract

Professional Learning Communities (PLCs) are in the implementation stages throughout the Wake County Public School System (WCPSS). Results from the 2007-08 High Five PLC Survey of teachers throughout the school system, as well as observations and focus group interviews in selected schools, show that strong support continues for PLC implementation overall, (66% to 87% of respondents agreed or strongly agreed with statements about each PLC element). Results suggest PLC concepts and work efforts are well underway and are growing in implementation. Challenges cited include finding time for PLC team work and remediation of student skills, increasing the understanding of all staff of PLC concepts, and increasing teachers' skills in developing and using quality formative assessments.

Full Report (PDF)

April 2008 Advancement Via Individual Determination (AVID): WCPSS Program Evaluation Baenen, Nancy
Lougée, Aimee

57 View Abstract

This evaluation examined the implementation and effectiveness of the AVID program in middle schools throughout the Wake County Public School System (WCPSS). Survey results and school visits revealed considerable inconsistencies in implementation across schools. Specifically, selection criteria were not consistently understood and applied, all staff members implementing the program were not able to attend AVID training, and some schools emphasized enrollment in Algebra I in eighth grade more than others as a desired outcome of AVID participation. Attrition from the program was high, with 38% of those enrolled in grade 6 in 2005-06 continuing with the program through grade 8 in 2007-08. The stated goal of having all AVID students enroll in Algebra I by grade 8 was not met, although a higher percentage of AVID students in grade 8 enrolled in Algebra I than was true system wide (50% vs. 28%).

Full Report (PDF)

April 2008 WCPSS High School Student Outcomes: 2006-07 Baenen, Nancy

108 View Abstract

Many indicators of performance, persistence, and academic rigor for WCPSS high school students point toward the relative success of WCPSS high school students. Student achievement remains high compared to state and national results, and an increasing number of students are pursuing rigorous AP coursework in high school. The skills and abilities that WCPSS graduates obtain appear to serve them well in the University of North Carolina (UNC) system, which is the most common educational destination for WCPSS graduates. However, changing student populations and rising academic standards are challenging the system's ability to sustain and increase academic performance for all students. Gaps in achievement have increased, with higher percentages of minority students and students with academic risk factors at risk of not graduating on time, compared to other groups.

Full Report (PDF)

March 2008 Effective Teaching Practices in U.S. History Haynie, Glenda
Stephani, Melinda

30 View Abstract

This study analyzed the instructional practices of more versus less effective U.S. History teachers identified by a multiple regression model. Using surveys, observations, and focus-group interviews, the study found that the most effective teachers had a more complete package of rigor, relevance, and relationship strategies than less effective teachers. Effective teachers had strong content knowledge, prepared their own materials, taught reading and note-taking skills, used time wisely, and connected history to themes across time. Relationships with students were of utmost importance to effective teachers. They gave frequent positive feedback and believed that all students could succeed. Effective teachers created an atmosphere of mutual respect, in which both teachers and students were enthusiastic. These results can be used to motivate teacher and school improvement efforts in a number of ways.

Full Report (PDF)

February 2008 Helping Improve Achievement for Students with Multiple Academic Risk Factors Baenen, Nancy

2 View Abstract

See abstracts document

Full Report (PDF)

February 2008 Improving Student Success in High School Algebra I by Identifying Successful Teachers and Schools Haynie, Glenda
Kellogg, Athena

30 View Abstract

This study examined practices of teachers in Wake County Public Schools (WCPSS) high school Algebra I classes. Regression analyses of standardized state testing results allowed for identification of the most effective and least effective Algebra I teachers and schools. The study used surveys, observations, and focus group interviews to compare and contrast most effective teachers with less effective teachers It found that the most effective algebra teachers averaged 68% of their time on new material daily; averaged seven transitions in ninety minutes; used sustaining feedback; had structured classes with a culture of mutual respect; told their students what to expect on tests and cautioned them about possible errors; emphasized problem solving and processes; and exhibited a sense of humor. These results can be used to motivate teacher and school improvement efforts.

Full Report (PDF)

January 2008 Facts for Families No.1 What Research Suggests to Help Your Student Achieve Baenen, Nancy

2 View Abstract

See abstracts document

Full Report (PDF)

August 2007 WCPSS Students with Multiple Academic Risks: Achievement Patterns and School Experiences Baenen, Nancy
Ives, Sarah
Paeplow, Colleen
Reichstetter, Rosemary

112 View Abstract

This study focused on effective practices for students with multiple academic risk factors (students with disabilities, students eligible for free or reduced price lunch, and/or students with limited English proficiency). Achievement performance patterns over several years differ between students making stronger and weaker achievement growth on End-of-Grade tests. Sixteen case studies of 5th and 8th graders revealed that students with positive achievement patterns were more likely to show signs of resilience in their personal characteristics, school experiences, and/or home support than were students with negative achievement patterns. Teachers of both groups used some methods recommended in national research (such as small-group work, structure, and collaboration). A specific focus on language development was not mentioned. Homework was a common problem.

Full Report (PDF)

June 2007 Effective Practices for Elementary School Students with Multiple Needs Baenen, Nancy

4 View Abstract

Document summarizes a larger study about elementary school-level practices that can make a difference in promoting the achievement growth of multiple-risk students: high expectations, positive attitudes about being able to meet students' needs with the resources available, supportive administrative leadership that allocates resources effectively, professional training, formal and information collaboration to help students, and more frequent use of teacher-led instruction.

Full Report (PDF)

June 2007 Effective Practices for Middle School Students with Multiple Needs Baenen, Nancy

4 View Abstract

School-level practices can make a difference in promoting the achievement growth of multiple-risk students. At the middle school level, effective school staffs were more likely to; focus more on how to address student needs and less on barriers to addressing needs; have more informal administrator visits in classrooms; have more positive attitudes and training in working with at-risk groups, and more frequently use resources such as assessment data, extra adults in classrooms, technology, and instructional pacing guides.

Full Report (PDF)

April 2007 Professional Learning Community (PLC) Implementation WCPSS 2006-07 Baseline Survey Results Baenen, Nancy
Reichstetter, Rosemary

21 View Abstract

Professional Learning Communities (PLCs) are being developed in the Wake County Public School System (WCPSS) to promote continuous improvement and student success. Baseline results from a 2006-07 survey show strong support for PLC concepts/expectations among school staff (at least 88% rated themes as medium or high priority), with lower implementation levels (60-73%) per theme. Sustained implementation of PLCs was reported by 24-30% of staff for each theme. Results suggest training in PLC concepts and strategies should be well received in WCPSS, and that increased implementation is clearly possible.

Full Report (PDF)

March 2007 WCPSS Elementary School Student Outcomes 2005-06 Baenen, Nancy
Holdzkom, David

99 View Abstract

This report draws together various academic performance results for elementary students in WCPSS. Generally speaking, students in grades K-5 continue to do well on most literacy measures, but there has been a decline in mathematics EOG performance, largely resulting from the State Board of Education's action to create more rigorous cut scores for achievement levels. Analysis of student outcomes is provided at the grade level as well as for subgroups. This report describes demographic trends that impact our student outcomes as well as information about students retained in grade. Finally, the report provides summaries of several research and evaluation efforts related to effective practices for promoting student achievement.

Full Report (PDF)

March 2007 WCPSS High School Student Outcomes 2005-06 Holdzkom, David
McMillen, Brad

93 View Abstract

Looking across various indicators of performance, persistence, and academic rigor for WCPSS high school students, many indicators point toward the relative success of WCPSS high school students. Student achievement remains high compared to state and national results, and an increasing number of students are pursuing rigorous AP coursework in high school. In addition, the skills and abilities that WCPSS graduates obtain appear to serve them well in the UNC system, which is the most common post-high school educational destination for WCPSS graduates. However, significant challenges remain related to changing student populations and rising academic standards which are challenging the system's ability to sustain and increase academic performance for all students.

Full Report (PDF)

March 2007 WCPSS Middle School Student Outcomes 2005-06 Baenen, Nancy
Holdzkom, David

84 View Abstract

This report draws together various academic performance results for middle school students in WCPSS. Generally speaking, students in grades 6-8 continue to do well on most literacy measures, but there has been a decline in mathematics EOG performance, largely resulting from the State Board of Education's action to create more rigorous cut scores for achievement levels. Results for the new test of computer skills are also a concern. Analysis of student outcomes is provided at the grade level as well as for subgroups. This report describes demographic trends that impact our student outcomes as well as information about students retained in grade. Finally, the report provides summaries of several research and evaluation efforts related to effective practices for promoting student achievement.

Full Report (PDF)

October 2006 Defining a Professional Learning Community: A Literature Review Reichstetter, Rosemary

4 View Abstract

Summarizing a nonexhaustive review of the literature, the following definition is suggested for a professional learning community: A professional learning community is made up of team members who regularly collaborate toward continued improvement in meeting learner needs through a shared curricular-focused vision. Facilitating this effort are: supportive leadership and structural conditions, collective challenging, questioning, and reflecting on team-designed lessons and instructional practices/experiences, and team decisions on essential learning outcomes and intervention/enrichment activities based on results of common formative student assessments.

Full Report (PDF)

October 2006 Effective Practices for At-Risk Elementary and Middle School Students Baenen, Nancy
Gilewicz, Ed
Ives, Sarah
Lynn, Amy
Warren, Tom
Yaman, Kimberly

72 View Abstract

The students who have the most difficulty reaching accountability standards in Wake County Public Schools are those with more than one of the following characteristics: recipients of free or reduced-price lunch, students with disabilities, and/or students with limited English proficiency. The Evaluation and Research Department identified elementary and middle schools that differed in their effectiveness in promoting achievement growth for these students. Quantitative and qualitative analyses suggest differences in both attitudes and practices. The more effective schools had higher expectations for these students, and greater confidence in their ability to meet students' needs. Evidence suggested more effective administrative leadership/support, training, and utilization of resources. Higher-growth middle schools utilized assessments to inform instruction more frequently, and higher-growth elementary schools had more structured collaboration around student needs. Further research is planned.

Full Report (PDF)

July 2006 High School Redesign 2004-05 Reichstetter, Rosemary

51 View Abstract

The Wake County Public School System (WCPSS) strengthened the rigor, relevance, and relationships within its high schools in 2004-05; a primary strategy was the adoption on a block schedule. This progress report found an increase in more rigorous academic opportunities. Higher numbers of enrollees engaged in advanced courses and generally stable or higher academic success was achieved with End-of-Course exams, grade point averages, and credits earned. Greater relevance in coursework was evident and a wider variety of instructional practices. Staff promoted stronger student-staff relationships by emphasizing personalization. The majority of students and teachers reported fewer discipline concerns in classes, and students felt connected with their schools. Dropout and suspension rates did not decline.

Full Report (PDF)

April 2006 Effective Biology Teaching: A Value-Added Instructional Improvement Analysis Model Haynie, Glenda

17 View Abstract

This research study developed a value-added instructional improvement analysis model. North Carolina state testing results were used in regression and residual analyses of student achievement. This analysis allowed for identification of the "most effective" and "least effective" biology teachers in Wake County Public Schools (WCPSS). The study found that the "most effective" biology teachers were focused on the delivery of biology instruction; resisted distractions from their classroom efforts; maximized student use of class time; studied and planned with other teachers using the North Carolina Biology Standard Course of Study; focused all student time on the Standard Course of Study goals; carefully planned teacher controlled student activities; and used data to guide their instructional practice.

Full Report (PDF)

February 2006 Project Achieve Evaluation: Year Four, 2004-05 Baenen, Nancy
Carpenter, Megan
Dudley, Kristy

35 View Abstract

Project Achieve, a local instructional initiative used by Wake County Public School System (WCPSS), was adapted from a Brazosport, Texas model. The program grew from eight to 19 WCPSS schools over four years, and all 16 continuing schools had a higher percentage of students at or above grade level in spring 2005 than prior to the program. Fourth-year results were relatively positive. Nine of 19 (47%) participating schools met the state ABCs High Growth standard (including two of the new schools), compared to 40% of other WCPSS elementary and middle schools. Eleven of 19 schools (58%) -- compared to 35% of other WCPSS elementary and middle schools -- increased the percentage of students at or above grade level between spring of 2004 and spring 2005.

Full Report (PDF)

December 2005 Advanced Placement (AP) Course-Taking, Exam Participation, and Exam Results, 2004-05 Dulaney, Chuck
McMillen, Brad

28 View Abstract

The first section of this bulletin summarizes Advanced Placement (AP) course participation and AP exam data for the Wake County Public School System for the 2004-05 school year. Overall, the percentage of high school students who took at least one AP course increased from 14.1% in 2003-04 to 15.7% in 2004-05. About 59% of students who took an AP course took the corresponding AP exam for that course, and about 78% of those exam scores were 3 or higher, which is the College Board's threshold for mastery. The second section reports on a more in-depth study of AP results for students from the 2003-04 school year that looks at the relationship between 8th-grade achievement and success in AP courses.

Full Report (PDF)

December 2005 End-of-Grade Multiple-Choice Test Results, 2004-05 McMillen, Brad

42 View Abstract

The percentage of reading and mathematics tests taken by Wake County Public School System (WCPSS) students in grades 3-8 that resulted in Level III or IV scores fell slightly in 2004-05 to 90.8% from 91.1% in 2003-04. The percentage of students scoring in Level III or IV was slightly higher in mathematics (91.4%) than in reading (90.4%). The percentage of students scoring in Level III or IV in reading showed slight increases at all grade levels except grade 4, while percentages in mathematics rose slightly in grades 6 and 7 and fell in grades 3, 4, and 5. Female students out performed male students in both subjects. Disaggregation by race/ethnicity, income level, and disability status showed either no change or a small increase in the percentage of reading scores at Level III or IV and no change or a small decline in mathematics for most groups.

Full Report (PDF)

October 2005 Adequate Yearly Progress (AYP) Results: 2004-05 Dulaney, Chuck
Haynie, Glenda

12 View Abstract

The Wake County Public School System (WCPSS) met 66 out of 73 (90.4%) measurabledistrict targets in the third year of federal No Child Left Behind (NCLB) accountability standards. The 2004-05 school year was the first year that the Annual Measurable Objectivesincreased. In grades 3-8, the objectives were 76.7% proficiency in reading, up from 68.9%, and 81.0% in math, up from 74.6%. In 10th grade, the Annual Measurable Objectives were given new starting points based on past student performance on English I, 10th-grade Writing, and Algebra I tests, which were approved as the high school primary tests. In spite of the new and increased targets, 63% of all WCPSS schools made AYP in 2004-05 (83 out of 132). Twenty-seven schools missed only one or two targets. Students with disabilities and recipients of free or reduced-price meals (economically disadvantaged) were the two subgroups that most often failed to meet AYP targets.

Full Report (PDF)

August 2005 ABC Outcomes for WCPSS for 2004-05 Dulaney, Chuck

11 View Abstract

ABC Outcomes for WCPSS for 2004-05

Full Report (PDF)

July 2005 Student Support Team Evaluation Baenen, Nancy
Harlow, Kristin2

66 View Abstract

Student Support Teams (SST) are designed to strengthen and support students who are experiencing academic, behavioral, family, and/or emotional difficulties that interfere with learning. SSTs develop and implement action plans using classroom-, school-, family-, and/or community-based strategies. In 2003-04, 80% of the 4,944 students served by SSTs were elementary students. Over half of the students referred for academic reasons scored on grade level before SST participation. Earlier SST meetings and family-based strategies were correlated with positive academic outcomes. Classroom-based strategies were correlated with fewer suspensions. Schools varied in their success in improving SST students' achievement. SST participants' growth in achievement was generally smaller than a matched comparison group over one year, but students could have differed in ways related to referral reasons. SST students closed the gap between their achievement and that of the district overall in some elementary grades but not at the secondary level.

Full Report (PDF)

May 2005 Student Outcomes After Reassignment for School Socioeconomic Diversity: Year Two Follow-Up Baenen, Nancy

8 View Abstract

This study examined whether reassignment, specifically when used to maintain socioeconomic diversity in WCPSS elementary schools, affects the academic outcomes of students over a two-year period. Results indicate that (1) only a small number of students in the year studied were reassigned only for diversity (with more reassigned for growth or other reasons). (2) Three-fourths of the students slated for reassignment did not attend the schools to which they had been assigned, instead choosing other options available to WCPSS students, such as magnet schools and special programs; and (3) reassigned students who did attend the schools to which they had been reassigned attained reasonable achievement in the two years following reassignment. Achievement results were mixed, with no clear advantage for either group. Only 37 students remained in their reassigned school by the end of year 2, so small sample sizes limit the generalizability of the results.

Full Report (PDF)

March 2005 East Wake High School Evening Program Reichstetter, Rosemary

14 View Abstract

The East Wake High School Evening Program study focused on whether the program was meeting its original intent and was cost/beneficial. The focus changed from serving only dropouts or students likely to drop out or not graduate who participated in the extended day program to serving any student needing course grade recovery. Most attempted courses were completed with credits earned, and grade promotions of enrollees increased. However, some classes were small, which increased the cost per student. Few dropouts enrolled in 2003-04, and overall enrollment was lower than previously.

Full Report (PDF)

February 2005 Block Scheduling Evaluation Baenen, Nancy
Reichstetter, Rosemary

62 View Abstract

In 2003-04, 11 Wake County Public School System (WCPSS) high schools moved from a traditional student schedule of six full-year courses to a block schedule of four courses each semester (4x4). Implementation went fairly smoothly, with 90% of teachers trained prior to the change. Academic course opportunities and course enrollment numbers increased substantially (by 24% and 46% respectively) compared to 2002-03, key desired outcomes. Academic success was marked by increases in credits earned, grade promotion rates, and twelfth grade graduation rates as desired. Maintenance of prior status was desired for other outcomes this first year. End-of-course performance and grade point averages of 3.0 or higher actually increased slightly, while Advanced Placement (AP) scores of 3 and greater decreased slightly. Student attendance and suspension rates remained the same. Generally, most of those surveyed and interviewed expressed satisfaction with the change. Exploring modified schedule options for some courses as well as continued professional development are recommended.

Full Report (PDF)

December 2004 Adequate Yearly Progress (AYP) Results: 2003-04 Dulaney, Chuck
Haynie, Glenda

16 View Abstract

Adequate Yearly Progress (AYP) Results: 2003-04

Full Report (PDF)

December 2004 Title V Evaluation Report 2003-04: E&R Section Page, Bethany

9 View Abstract

For the 2003-04 school year, WCPSS applied for and received Title V funding for "education reform and school improvement." WCPSS used funds to support two International Baccalaureate (IB) programs: the Middle Years Programme (MYP) at Broughton High School and the Diploma Programme (DP) at Garner Senior High School. Additional funds were used to fund a senior evaluator for school accountability to provide data to inform school improvement and student achievement. The report provides evidence of implementation and outcomes.

Full Report (PDF)

November 2004 Fast Forword Evaluation: 2003-04 Baenen, Nancy
Germuth, Amy

22 View Abstract

In 2003-04, 1,912 students in 16 elementary and 6 middle schools in the Wake County Public School System (WCPSS) participated in Fast ForWord program. Evaluation findings indicate that elementary and middle school participants made short-term gains averaging 22-55 months (approximately 2-4 years) of gain in terms of foundational listening and reading skills after nine weeks of intervention. When compared to students who had not received Fast ForWord instruction in 2003-04, both groups appeared to make similar gains on the Reading EOG over one year, although 7th and 8th graders served via Fast ForWord made greater gains on the math EOG. Over two years, students who received Fast ForWord in 2002-03 again performed similarly to their at-risk peers who had not received services in Reading EOG scores and gains. These findings suggest that Fast ForWord appears to impact foundational reading skills, but is not sufficient on its own to influence higher level reading skills and comprehension as measured by EOGs.

Full Report (PDF)

October 2004 Annual Performance Report 2003-2004 Magnet Schools Assistance Program Grant Penta, Mary

146 View Abstract

The Magnet Schools Assistance Program Annual Performance Report Year 3 (2003-2004) was implemented from September 1, 2003, through August 31, 2004 in the WCPSS. Staff members implemented activities this U.S. Department of Education grant project. They built upon the foundation established in Years 1 and 2 and endeavored to fully accomplish the scope and objectives of the project by the end of Year 3. They sought to reach all performance benchmarks established for Year 3 as well as to make up for any benchmarks not fully achieved in Years 1 and 2. When senior members of the project staff realized that not every objective would be fully completed by the end of Year 3, they requested and received a no-cost extension from the MSAP office for an additional project year (September 1, 2004-August 31, 2005). Schools participating in the project and their magnet themes are: Brooks Elementary School - Museums, Joyner Elementary School - Language Explorations, Millbrook Elementary School - International Baccalaureate, Powell Elementary School - Visual and Performing Arts, and Moore Square Middle School - Museums. The project focuses on four major purposes and has objectives related to each. Annual benchmarks have been established to measure success in achieving the objectives. The four MSAP purposes are listed below, followed by a summary of accomplishments or deficits in meeting the Year 3 benchmarks for each purpose.

Full Report (PDF)

October 2004 WCPSS Outcomes Summary for 2003-04, With an Emphasis on Achievement Gap Status Baenen, Nancy
Dulaney, Chuck
Yaman, Kimberly

22 View Abstract

The Wake County Public School System (WCPSS) has seen positive changes in patterns of achievement and dropout rates over the past several years overall and by subgroup. The most positive one-year subgroup changes related to dropout rates for Black students and Adequate Yearly Progress (AYP) for minority, low-income, and limited English proficient (LEP) students. However, many achievement gaps remain, and the system continues to work towards optimal achievement for all students and closing achievement gaps.

Full Report (PDF)

April 2004 From Complacency to Excellence Through School District Reform: A Case Study of the WCPSS Banks, Karen

52 View Abstract

WCPSS has made some notable positive changes in achievement, graduation, and other outcomes over the last few years. This document summarizes trends over time in outcomes and district efforts which likely contributed.

Full Report (PDF)

April 2004 Project Achieve: Adapting the Brazosport Model to a Large LEA Baenen, Nancy
Speas, Carol

18 View Abstract

Project Achieve is a major Wake County Public School System (WCPSS) instructional initiative to improve student achievement adapted from a Brazosport, Texas model. The number of schools involved increased from 8 to 13 in 2002-03. Results were positive. All Project Achieve elementary and middle schools met the state ABCs High Growth standard both years (up from five in spring 2001), and nearly all schools increased the percent of students at or above grade level in their first year. In Year 2, compared to other WCPSS students, participation in Project Achieve was generally associated with significantly higher gains in mathematics and similar gains in reading (when background characteristics were controlled through regression analyses). Staff members also expressed more positive opinions about the academic program in their schools than in the past.

Full Report (PDF)

January 2004 Accelerated Learning Program (ALP) Grades 3-8: Evaluation 2002-03 Baenen, Nancy

36 View Abstract

The Accelerated Learning Program (ALP) began in the Wake County Public School System (WCPSS) in 1999-2000 as an out-of-school time intervention to support students scoring below grade level. Since then, flexibility in use of these funds has increased, along with the percentage of schools using the funds to support low achievers during the school day. In 2002-03, over 70% of traditional calendar schools reported providing at least a portion of their ALP services during the school day, followed by after-school sessions (about 40%), and Saturday sessions (20%). At year-round schools, intersession continues to be the most common time for ALP at the elementary (82%). However, year-round middle schools provided ALP most commonly during the school day (83%), with only 34% using intersessions. Changes in use of ALP funds have made it increasingly difficult to clearly identify which students these funds supported. Although all schools reported that students who scored below grade level were supported through ALP, data on individual students suggests that the percentage of these students in ALP declined from 59% in 2001-02 to 35% in 2002-03. The lower participation rates are partially due to under-reporting, but clearer accountability for serving students is needed.

Full Report (PDF)

January 2004 Project Achieve Evaluation: Year Two, 2002-03 Speas, Carol

38 View Abstract

Project Achieve is a major Wake County Public School System (WCPSS) instructional initiative to improve student achievement adapted from a Brazosport, Texas model. The number of schools involved increased from 8 to 13 in 2002-03. Results were generally positive. All Project Achieve elementary and middle schools met the state ABCs High Growth standard in spring 2003 (up from five in spring 2001), and 10 of 13 schools increased the percent of students at or above grade level. Compared to other WCPSS students, participation in Project Achieve was generally associated with significantly higher gains in mathematics and similar gains in reading (when background characteristics were controlled through regression analyses). Staff members also expressed more positive opinions about the academic program in their schools than in the past.

Full Report (PDF)

December 2003 A Study of the 1995 WCPSS 9TH - Grade Students with Disabilities Cohort Haynie, Glenda

27 View Abstract

In a study of 5,226 first-time 1995 9th-grade students, 12% of the students were students with disabilities (SWD). Academic performance indicators for the SWD group were far below the overall cohort indicators. Difficulties for students with disabilities could be observed beginning in ninth grade. The average GPA of SWD students at the end of ninth grade was 1.79(a D+ average) compared to an average GPA of 2.58 (a C+ average) for the overall cohort. Just 57% of the SWD cohort graduated (defined as completion of 12th grade with a diploma or certificate) compared to 77% of the overall cohort. Of the graduating SWD students, only 36% took the SAT with an average total score of 949, while 76% of the overall cohort took the SAT with an average total score of 1065. Black SWD students were less likely to graduate than White SWD students (45% compared to 66%). Behaviorally/Emotionally Disabled (BED) Black female students were least likely to graduate (13%). The 43% of SWD students who dropped out had a ninth grade average GPA of 0.82 (below a D average).

Full Report (PDF)

October 2003 Wake County Safe Schools/Healthy Students Grant Final Report 1999-2003 Baenen, Nancy
Harlow, Kristin2

51 View Abstract

The Safe Schools/Healthy Students Grant (SS/HS) was a three-year grant sponsored by a collaboration between the federal Departments of Health and Human Services, Juvenile Justice, and Education. The SS/HS Grant improved collaboration and communication across community agencies. During the grant period perceptions of safety improved among WCPSS students and staff, and juvenile arrests for violence and substance abuse decreased. However, school crime and violence rates, suspensions, and security violations did not decrease as hoped. Many SS/HS funded programs showed promising results, especially Teen Court (increased participation and decreased suspensions for participants) and NovaNET (80% of courses students attempted were completed successfully). Overall, SS/HS provided resources for community change, and new ideas for addressing school safety in the future.

Full Report (PDF)

September 2003 Fast ForWord Evaluation, 2002-03 Baenen, Nancy
Overbay, Amy

18 View Abstract

The 2001-02 evaluation of Fast ForWord established that participants experienced short-term gains in language and reading skills, as measured by the Woodcock Diagnostic Reading Battery. EOG results also indicated that participants made significant gains in reading achievement. This evaluation examined the reading achievement of 2002-03 Fast ForWord participants relative to a comparison group, and investigated factors that predict success on reading EOG tests. Results for 2002-03 participants indicate that participants made significant gains on EOGs, but that their achievement growth pattern was not significantly different than that of matched non-participants. The short and long versions of the Teacher Observation Survey (TOS) predicted success equally well, and no demographic characteristics predicted success consistently. Thus, no simple means of selecting the most appropriate participants were identified.

Full Report (PDF)

July 2003 Annual Performance Report 2002-2003 Magnet Schools Assistance Program Grant Penta, Mary

180 View Abstract

Magnet Schools Assistance Program Annual Performance Report Year 2 (2002-03) From September 1, 2002, through June 30, 2003, the staff members of the Wake County Public School System (WCPSS) 2001-04 Magnet Schools Assistance Program (MSAP) grant have successfully built upon the foundation they established in Year 1. This year they have endeavored to make up for any objectives not fully achieved in Year 1 and to attain all of their Year 2 objectives. Schools participating in the project and their magnet themes are: Brooks Elementary School - Museums, Joyner Elementary School - Language Explorations, Millbrook Elementary School - International Baccalaureate, Powell Elementary School - Visual and Performing Arts, and Moore Square Middle School - Museums. The project focuses on four major purposes and has objectives related to each. Annual benchmarks have been established to measure success in achieving the objectives. The four MSAP purposes are listed below, followed by a summary of accomplishments or deficits in meeting the Year 2 benchmarks for each purpose.

Full Report (PDF)

July 2003 Has ALP Helped Low-Achieving Students? Baenen, Nancy
Yaman, Kimberly

2 View Abstract

To help accomplish Goal 2003, WCPSS allocated money in 1999 for supplemental instructional support through the Accelerated Learning Program (ALP). Analyses of the program's 2001-02 results suggest that ALP was effective in promoting both achievement growth and performance at grades 3-8. ALP students showed high growth based on ABCs standards, and more than half were able to move from below to above grade level between spring 2001 and spring 2002 (compared to 38% in reading and 41% in math before ALP began).

Full Report (PDF)

May 2003 Safe Schools/Healthy Students Grant Year 4 Mid-Year Performance Report Project Status October 1, 2002 - April 30, 2003 Baenen, Nancy
Harlow, Kristin2

6 View Abstract

The Wake County Public School System (WCPSS) is currently in the extension year, or Year 4, of the Safe Schools/Healthy Students grant. This report outlines the activities continued in the extension year, and a status report on each activity for the first part of Year 4.

Full Report (PDF)

April 2003 Advanced Placement Exam Results 2001-2002 Regan, Roger

30 View Abstract

Students at 15 Wake County Public School System (WCPSS) high schools took approximately 4,878 Advanced Placement exams offered by the College Board in 2001-02. With 20% of all juniors and seniors in the district taking at least one AP exam, the percent attaining a score of 3 or higher on a 5-point scale (the score typically needed to qualify for college course credit) reached a 10-year high of 80.5%, up 3.3 percentage points from the previous year. WCPSS' overall success rate was higher than that of comparable large school districts, and 17 percentage points higher than the rate for the nation as a whole. On the five most frequently taken AP exams, the percent of scores that were 3 or higher rose an average of 8.6 points.

Full Report (PDF)

March 2003 Accelerated Learning Program (ALP): Grade 3-8 Evaluation 2001-02 Baenen, Nancy
Lindblad, Mark
Yaman, Kimberly

107 View Abstract

WCPSS initiated the Accelerated Learning Program (ALP) in 1999-2000 as the major new intervention to help all students reach grade-level performance in reading and math. Analyses of the program's third year results show that overall, changes in both achievement growth and performance support the effectiveness of ALP and other assistance at grades 3-8.

Full Report (PDF)

February 2003 Class-Size Reduction Program 2001-02 Speas, Carol

24 View Abstract

In 2001-02, 23 schools were provided with 40 teacher positions through the Class Size Reduction (CSR) Program. Achievement results for students in reduced class sizes were compared to those of similar students in other CSR schools who did not choose the same grade for the project (keeping school and student demographics similar). At grades 1 and 2, WCPSS K-2 Literacy and Mathematics Assessments were compared pre (spring 2001) and post (spring 2002). These analyses yielded mixed results: (a) an increase in the percentage of students meeting the reading-book-level standards was greater for students in the reduced-size classes at grade 2 but not at grade 1, and (b) an increase in the percentage of students meeting the mathematics standards was greater for students in the reduced-size classes at grade 1 but not at grade 2. As in the previous year at grade 3, the NC End-of-Grade fall pretest and spring post-test data indicate that, controlling for differences in pre-test scores and free and reduced-price lunch status of students, there were no significant differences in reading and mathematics achievement between students in reduced-size classes and those in regular-sized classes. As in previous years, WCPSS generally did not reach a class size of 18, the goal of the enabling legislation, and it was again recommended that schools receiving two CSR teacher positions should place two teachers at the same grade level to reduce class sizes at a single grade.

Full Report (PDF)

February 2003 NovaNET Student Outcomes 2001-2002 Baenen, Nancy
Harlow, Kristin2

23 View Abstract

In the 2001-02 school year, NovaNET students earned significantly higher GPAs and fewer F's than before participating in NovaNET. NovaNET students did not show significantly greater gains than students in a comparison group that had similar demographic and academic characteristics; however, analyses revealed that the two groups varied somewhat in terms of prior suspensions, so results should be interpreted with caution. Some schools had much greater participation and student success than others. Strategies used by successful NovaNET programs include individualizing coursework; supplemental counseling and behavior modification; selecting the most appropriate students; requiring students to sign a contract promising to complete the course; and giving offline assignments to supplement NovaNET. Extending successful school practices to all schools could increase overall program impact.

Full Report (PDF)

February 2003 Project Achieve Evaluation Report: Year One, 2001-2002 Speas, Carol

71 View Abstract

This is an evaluation of the pilot year of Project Achieve, a major local instructional initiative at six elementary schools and two middle schools to help reach the WCPSS goal of 95% of students at or above grade level. Participating schools had a higher percentage of low-income students and low-achieving students and slightly less stable student populations than the district as a whole. The initiative is based on the same principles and instructional process applied in the Brazosport, Texas school district, with modifications tailored to local needs and based on the NC Standard Course of Study. Project training and development did occur as planned from early 2001 to implementation in the 2001-02 school year. Participating schools did exceed ABCs growth and performance standards of the previous (baseline) year, as evidenced by annual NC ABCs Accountability System reports. Additionally, parents and staff expressed more positive opinions about the academic program in participating schools.

Full Report (PDF)

February 2003 Title VI: Annual Evaluation Report 2001-2002 Overbay, Amy
Speas, Carol

25 View Abstract

In the 2001-02 school year, Wake County Public School System (WCPSS) implemented a project within an innovative assistance program area of Title VI- the provision of performing arts teachers within magnet elementary schools to provide arts education - under the "promising educational reform projects" category. Twelve arts teachers, representing between 0.3 and 1.0 FTE each, served in six elementary magnet schools: Fuller, Powell, Washington, Wendell, Conn, and Wiley. Also, in spring 2001, funding was allocated for planning and training activities for a new school improvement/reorganization effort at eight schools. WPSS Instructional Services Division identified a set of six schools showing historical patterns of below-expectation growth, and two schools volunteered to participate in "Project Achieve." Training and development for the eight schools did occur as planned in July - October, 2001. Results are shared.

Full Report (PDF)

July 2002 Annual Performance Report 2001-2002 Magnet Schools Assistance Program Grant Penta, Mary

123 View Abstract

In 2001-02, WCPSS Magnet Schools Assistance Program (MSAP) grant began implementation for three schools in the project and planned for two others. Schools in their first implementation year were: Joyner Elementary School, Language Explorations Millbrook Elementary School, International Baccalaureate Primary Years Programme Powell Elementary School ,Visual and Performing Arts Schools in their planning year included Brooks Elementary School ( Museums), and Moore Square Middle School ( Museums). Objective accomplishment as of the end of year 1 is described.

Full Report (PDF)

June 2002 Wake County Safe Schools/Healthy Students Project Year Three - Mid-Year Performance Report October 1, 2001 - May 31, 2002 Baenen, Nancy
Harlow, Kristin2
Overbay, Amy

41 View Abstract

The Wake County Safe Schools/Healthy Students (SS/HS) Project was a three-year federal cooperative effort sponsored by the Department of Education, the Department of Juvenile Justice, and the Department of Health and Human Services. This report focuses on year 3 results. While all students were impacted indirectly, 3,315 individual students were served directly by SS/HS intervention programs, and 16,100 students participated in group prevention activities; SS/HS disproportionately served the higher risk students in the system directly as intended. The grant had many positive benefits in Year 3. A safe school environment was promoted by security system installation, and use of the WAVE Line. Alcohol, drug, and violence prevention and early intervention programs were promoted through a Communities in Schools (CIS/CLP) mentoring program, which had a positive effect on student achievement. Teen Court expanded the number of youth served, as well as the range of programs available for those youth. In terms of school and community mental health preventive and treatment intervention services, Children of Substance Abuse (COSA) groups drastically reduced the number of students reporting that they would use violence in the future. The preschool Second Step program resulted in teachers spending less time disciplining students. Five different curricula related to SS/HS reached over 15,000 WCPSS students. NovaNET improved students' ability to pass courses and get back on track to graduation.

Full Report (PDF)

May 2002 Class-Size Reduction Program Evaluation, 2000-2001 Speas, Carol

22 View Abstract

This report examines the impact of the second year of the federal Class-Size Reduction (CSR) program in the Wake County Public School System (WCPSS) on student achievement.

Full Report (PDF)

May 2002 Title VI: Annual Evaluation Report 2000-2001 Speas, Carol

18 View Abstract

The Wake County Public School System developed a project within an innovative assistance program area of Title VI--the provision of performing arts teachers within magnet elementary schools to provide arts education--under the "promising educational reform projects" category. Funding provided to private non-profit schools was used primarily for curricular materials. In the spring of 2001, Title VI funding was allocated for planning and training activities for new school improvement/reorganization efforts at seven schools under the "3a. Promising Educational Reform Programs: Effective Schools" category. This report provides information on implementation and attainment of objectives.

Full Report (PDF)

February 2002 NovaNET 2000-2001: Analyses of Student Outcomes Relative to a Comparison Group Baenen, Nancy
Harlow, Kristin2

12 View Abstract

NovaNET is an on-line computerized instructional system that provides students with self-paced instruction for many North Carolina high school courses. This evaluation looks at outcomes for students participating in the NovaNET program and compares them with outcomes for a group of students with similar characteristics who did not participate in NovaNET. The primary positive finding was that the number of failing grades decreased significantly for students who participated in NovaNET, while a slight increase occurred for matched students. The GPA for NovaNET students showed a significant increase, but the comparison group increased about the same amount (difference between increases were not significant). NovaNET appeared to have more of a positive impact on math and social studies course grades than on English and science course grades. The pass rate for NovaNET science courses was only 50%. NovaNET did not appear to impact suspensions in 2000-2001; rates for NovaNET and matched students were statistically similar. NovaNET students were more likely to drop out of school in 2000-2001 than the comparison students who had a lower dropout rate than WCPSS overall; the change in drop-out rates should be examined again over the next few years. Overall, NovaNET seems to help students pass classes. However, more specific findings are difficult to obtain due to the newness of the program, and the difficulty of creating an accurately matched comparison group.

Full Report (PDF)

February 2002 The Accelerated Learning Program (ALP) 2000-01: Student Participation and Effectiveness Baenen, Nancy
Lindblad, Mark
Yaman, Kimberly

71 View Abstract

The Accelerated Learning Program (ALP) is the major initiative that the Wake County Public School System (WCPSS) is using to help all students reach grade level performance in reading and math. In 2000-01, ALP's second year of implementation, the program expanded from grades 3-8 to K-12. This report focuses on student participation rates and the impact of the ALP program.

Full Report (PDF)

January 2002 Summer Academy in the Wake County Public Schools: An Evaluation of the 2001 Program Holdzkom, David

20 View Abstract

Summer Academy in the Wake County Public Schools: An Evaluation of the 2001 Program

Full Report (PDF)

November 2001 The Effectiveness of the Wake Summerbridge Summer Enrichment Program Baenen, Nancy
Harlow, Kristin2

7 View Abstract

Wake Summerbridge is an enrichment program that has supported selected WCPSS middle school students for a number of years. This evaluation compared subsequent academic performance, suspensions and dropout rates of students who had participated in the program with a comparison group of students with similar characteristics who did not participate in the program. The main positive finding was that dropout rates were much lower for Summerbridge students than for the comparison group (1% versus 13%). Achievement scores and grade point averages showed a slight but consistent advantage in absolute terms for Summerbridge students over the comparison group. The differences were not statistically significant, although they may have some educational significance. The percentage of students receiving F's and suspension rates actually favored the comparison group. However, the higher dropout rate among comparison students may account for the lower number of F's earned by this group. Some cautions must be kept in mind when interpreting these findings. Sample sizes were relatively small which makes statistical significance more difficult to detect (about 80 per group). Groups could differ in ways that could not be determined from school system data files (e.g., attitude toward school, rigor of course selections, middle versus higher income status). Given the results, the cost of providing the service should also be considered in decisions about future funding.

Full Report (PDF)

July 2001 Annual Performance Report 2000-2001 Magnet Schools Assistance Program Grant Penta, Mary

99 View Abstract

Innovations begun in Year 1 were strengthened and expanded in Year 2 and fully developed by Year 3. Project activities have enhanced the magnet schools in ways that will attract and benefit students in the coming years. The CBALC's accelerated learning program has provided students with tools to support academic success in the future. The project focuses on four major purposes and has objectives related to each. Annual benchmarks have been established to measure success in achieving each objective. Each MSAP purpose is listed below, followed by a summary of accomplishments in meeting the Year 3 benchmarks for that purpose.

Full Report (PDF)

July 2001 Structure of Accelerated Learning Program (ALP) Efforts 2000-01 Baenen, Nancy
Yaman, Kimberly

105 View Abstract

This report focuses on the structure of instructional assistance available through ALP to students who show low achievement. Information is also provided on other programs available to these students. For many years, WCPSS has had instructional support available through a variety of grant-funded programs to students with special needs. However, student needs could not be fully met through these original resources. To help accomplish goal 2003 (for 95% of students to score proficient on EOG tests), local dollars were allocated for supplemental instructional support.

Full Report (HTML)  |  Full Report (PDF)

January 2000 Building Successful Teacher Use of Computers in the Classroom Reichstetter, Rosemary

25 View Abstract

Middle school teachers in the Wake County Public School System use computers more as their level of training increases, especially when that training addresses their specific subject areas*. More frequent use is also related to specific training components delivered by the instructor (presentation of theory, demonstrations/modeling of use, coaching/feedback regarding use, and practice) and to the availability of ongoing support. The study concluded that technology training, addressing teaching areas (e.g., language arts, mathematics, sciences, etc.), and the delivery of specific training components combine to be the best predictor of subsequent computer use by teachers. The study further concluded that technology training was related to frequency of classroom instructional use in nine of eleven types of computer technology (e.g., word processing, spreadsheets, databases, desktop publishing). Of overall interest is that approximately one-third (31%) of the teacher respondents reported no computer use in their lessons at all and many reported no computer use in specific computer technology types.

Full Report (PDF)