WCPSS Logo

Tag: Coaching

Your search found 25 reports. Refine your search.

If you need assistance finding a specific report, please contact wcpss-data-accountability@wcpss.net.

Published Document Title Authors Pages Abstract
April 2019 Elementary Support Model Implementation and Outcomes: 2014-15 to 2017-18 Boykin, Anne-Sylvie
Paeplow, Colleen
Scrimgeour, Meghan
Singh, Malkeet

28 View Abstract

The Elementary Support Model (ESM) was implemented in Wake County Public School System’s (WCPSS) 12 lowest performing elementary schools. ESM is designed to improve teacher and student outcomes by addressing governance, staffing, professional development, resources, calendar and schedule, and provides leadership and instructional coaching. Qualitative methods were used to assess implementation and a quasi-experimental design was utilized to examine ESM’s intermediate and long-term outcomes. The implementation of ESM in WCPSS was strong. ESM was also successful in meeting, or mostly meeting, its short-term goals related to professional development, coaching, and governance. Results related to intermediate and long-term goals were mixed. Three areas of strength were principal support to teachers, reduction of beginning teachers, and increases in the number of ESM schools meeting EVAAS growth; however, additional goals related to student outcomes were either only partially met or not met. Recommendations focus on strengthening implementation and continuing to monitor progress toward reaching program goals.

Full Report (PDF)

May 2013 Formative Assessment with Technology 2011-12: Second Year of Implementation Bulgakov-Cooke, Dina
Talbot, Troy

30 View Abstract

The second year (2011-12) of the Formative Assessment with Technology Project in three WCPSS schools was studied to determine the fidelity of implementation of the formative assessment practices and the project's impact on student achievement. Classroom observations and surveys of teachers and students showed that implementation was moderate, and it varied widely across teachers. Certain targeted practices were reported or observed much more often than others. High turnover in the teachers participating in the project likely contributed to the uneven implementation. High school staff had the highest level of implementation of training concepts as well as the highest use of the electronic response tools for assessment. Full implementation and impact on state achievement test scores was expected to take two years to be evident. Since only nine teachers participated and had data for two years, impact could not be reliably assessed. This pilot training model would be too expensive to roll out district-wide in WCPSS. More cost effective models may be used to encourage appropriate use of formative assessment.

Full Report (PDF)

May 2013 High Five PLT Survey Results, 2007-08 to 2012-13 Jackl, Andrew

20 View Abstract

WCPSS PLT survey responses have been positive over time, remaining at high levels for the past six school years. Analyses of High Five PLT Survey data from 2007-08 to 2012-13 show: The percentage of positive agreement to each of the High Five PLT Survey themes increased between 4 and 11 percentage points since baseline data was first collected in the 2007-08 school year. When the survey data were disaggregated by the six PLT themes, only "collaborative culture/team processes" showed a decline (two percentage points). When the survey items are examined individually, the percentage of respondents marking that they "strongly agree" almost universally decreased from 2011-12, while the percentage marking "agree" showed a corresponding increase. Administering the High Five PLT Survey at less frequent intervals is recommended, as well as standardized PLT training for all new staff.

Full Report (PDF)

March 2013 Evaluation of the Teacher Incentive Fund (TIF) Program: Wilburn Elementary School, Year 2 2011-12 Baenen, Nancy

30 View Abstract

Wilburn was in its fourth year of implementing Teacher Advancement Program (TAP) in 2011-12, which is designed to attract, retain, and motivate quality teachers and increase student achievement. It was in the second year of TIF funding to provide performance pay for improved student performance. Analysis of EOG reading and math test scores for 2011-12 showed increases in student performance (where different cohorts of students are compared over time) and growth (when a student is compared to him- or herself over time). All staff earned some performance pay based on the TAP model formulas (unlike the previous year). Recommendations are to provide more ways for teachers to share their perceptions of TAP, to start observations earlier in the year, and to improve training by focusing on the application of the rubric and differentiating training (for teachers new to TAP and those with experience).

Full Report (PDF)

January 2013 2011-12 District Improvement Initiatives Evaluation Bulgakov-Cooke, Dina

85 View Abstract

Seven District Improvement initiatives were implemented in 2011-12 in WCPSS. All were well designed and coordinated, with common goal setting processes and use of common monitoring tools. All initiatives either met or partially met 2011-12 goals. Some were more successful in showing student outcomes, with the most positive initiatives being elementary mathematics and adolescent literacy. These results should be used to influence future decisions about continuation or strengthening of these efforts. New components that were well received and implemented by those trained (but which did not have achievement results as yet) should also be considered for future funding.

Full Report (PDF)

October 2012 WCPSS Teacher Working Conditions Survey Results: 2011-12 Halstead, Elizabeth

20 View Abstract

During the spring of 2012, over 100,000 educators across the state took the North Carolina Teacher Working Conditions (TWC) survey. WCPSS teachers responded more positively to 46 of the 85 survey items in 2012 than did teachers statewide. On 14 items, WCPSS teachers' responses were less favorable than those of teachers statewide, and on the remaining 25, there was no statistically significant difference. Results from this survey are discussed.

Full Report (PDF)

July 2012 High Five PLT Survey Results, 2007-12 Jackl, Andrew

20 View Abstract

Summary - WCPSS PLT survey responses have been positive over time, reaching a high plateau for the last three years. Analyses of High Five PLT Survey data from 2007-12 show: In 2011-12, high percentages (87.2%) of WCPSS teachers responding to the High Five PLT Survey provided positive responses to the items. Responses have been positive from 2007-08 to 2011-12, with small increases over time. Overall, WCPSS has shown an improvement in its PLT Performance Index of 5.7 percentage points over five years. The elementary, middle, and high schools have shown gains of 4.2, 7.5, and 9.1 percentage points, respectively. The implementation of dedicated time for PLT work (Wake Wednesdays) correlated to slight increases in PLT indices at the elementary and middle school levels; only the elementary level saw a slight decline when dedicated time was no longer provided.

Full Report (PDF)

April 2012 Wake County Public School System (WCPSS) Professional Learning Teams (PLTs): 2010-11 to 2011-12 School-Based Policy Study Jackl, Andrew
Lougée, Aimee

38 View Abstract

Professional Learning Teams were first introduced in WCPSS in 2003. Implementation checks, first done in 2007-08, showed most teachers (81.5%) reported involvement in PLT work. These high percentages improved slowly over time, with 87% positive responses to items by fall of 2011. In terms of impact, 81% of teachers indicated students learned more because of their PLT work. Student retention rates, classroom grades, state test performance, and graduation rates have all improved over time. Regression analyses indicated those schools who utilized PLTs the most had greater decreases in student retention rates than those with lower implementation. Similar analyses for student growth on test results just missed statistical significance. While it is difficult to separate out the impact of PLT work from other initiatives, these analyses suggest PLTs have contributed to improvements in WCPSS outcomes despite tough economic times and increasing challenges for teachers.

Full Report (PDF)

December 2011 WCPSS District Improvement Implementation 2010-11 Baenen, Nancy
Bulgakov-Cooke, Dina

94 View Abstract

Instructional strategies aimed at improving achievement of low performing student subgroups in need of support were selected by the District Improvement Advisory Committee, so that WCPSS could exit District Improvement status. Impact of each initiative, which often included teacher training and coaching is examined in this implementation report. Recommendations are made including setting strategic goals and systematically monitoring implementation; targeting schools or teachers with high numbers of AYP groups of students in need of support; being intentional in coaching efforts and structuring coaching models based on the SIOP® experience; building ownership and commitment at the school level; and coordinating new and existing efforts to optimize effectiveness.

Full Report (PDF)

July 2011 Teacher Advancement Program (TAP) at Wilburn Elementary School: Year 3 Evaluation Report Baenen, Nancy

21 View Abstract

The Teacher Advancement Program (TAP) is a model for training, teacher advancement, and instructional strategies. Based on interviews and observations, the four TAP principles were implemented with fidelity during the 2010-11 school year, with one exception--teacher evaluations. Feedback was slow, and teachers had concerns about the reliability of the ratings. The impact on teachers was negative. Compared to 2009-10, reading and math proficiency improved in grades 3 and 5 in 2010-11 but not grade 4. However, compared to proficiency before TAP began, only Grade 5 had improved reading proficiency and none of the grades (3, 4, and 5) had higher proficiency in math. Grade 4 had positive trends for Academic Change (growth) in both reading and math.

Full Report (PDF)

April 2011 WCPSS 2010-11 High Five Professional Learning Teams (PLT) Survey Results: Implementation Over Time Jackl, Andrew

36 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Teams (PLTs) as a research-based method of improving teacher effectiveness and increasing student achievement. Over each of the last four years, a survey of educators was conducted in WCPSS and the other four High Five districts. As in previous years, this year's data showed strong support among teachers for the PLT model; between 73% and 91% of respondents indicating that they "strongly agree" or "agree" with the statements pertaining to the six PLT themes. Viewed longitudinally, positive responses for each theme have increased between four and eight percentage points since 2007-08. When 2010-11 results were compared with 2009-10, the results were less dramatic, with smaller changes in the percentage of positive responses.

Full Report (PDF)

January 2011 Academy of Reading® (AoR) 2008-09 and 2009-10 Evaluation Baenen, Nancy
Lougée, Aimee

68 View Abstract

Academy of READING (AoR) is designed to improve students' foundational reading skills; it is used in almost all Wake County Public Schools (WCPSS) secondary schools. Central staff recommended students with prior End of Grade/Course (EOG/EOC) scale scores placing them high in Level II or low in Level III have first priority for service; many students served scored below this range (second priority). Program completion rates increased from 2008-09 (26%) to 2009-10 (41%), but were still considerably lower than desired (100%). Growth for 2009-10 AoR participants on End of Grade reading/English tests was strong (with the percentage of students reaching their growth targets increasing from 37.5% before service to 60.1% afterwards). This improvement is educationally important. Program completion gave students only a slight advantage in terms of EOG growth. The program appeared to be helpful, with patterns generally favoring middle school over high school students.

Full Report (PDF)

November 2010 WCPSS Professional Learning Teams (PLTs): 2009-10 School-Based Policy Implementation Study Baenen, Nancy

122 View Abstract

As a result of Board Policy 3610, PLTs were implemented across WCPSS in a consistent fashion in 2009-10. Data show that implementation improved and teachers spent more time engaged in collaborative work. School staff cited numerous benefits for teachers and students. Regression analyses showed a reasonably strong correlation between high levels of PLT implementation and students' academic achievement, attendance, and their overall level of satisfaction with their schools. Essential characteristics of PLTs were illustrated in case studies of high-performing PLTs' in the district. While collaborative cultures have been well-established, most teams could benefit from additional training on ways to use data, and on ways to evaluate the success of their efforts. Communications with school communities could also be more consistent across schools.

Full Report (PDF)

September 2010 WCPSS District Improvement: 2009-10 Implementation Status Bulgakov-Cooke, Dina

46 View Abstract

In 2009-10 Wake County Public Schools System (WCPSS) exited District Improvement in reading and remained in level one for mathematics. All District Improvement efforts gained momentum. The Sheltered Instruction Observation Protocol (SIOP®) continued as the primary focus to meet the needs of limited English proficient (LEP) students in elementary and middle schools. The high school component was modified and addressed both literacy and mathematics. The number of trained SIOP® teachers considerably increased (from 588 in 2008-09 to 956 in 2009-10), follow-up coaching to support application of training reached more teachers, training implementation and buy-in strengthened. All SIOP® training, coaching, and implementation objectives for in 2009-10 were met or partially met. The number and use of SIOP® modified focus lessons increased substantially, but awareness could still be improved.

Full Report (PDF)

May 2010 WCPSS 2009-10 High Five PLT Survey Results: Professional Learning Team (PLT) Implementation Over Time Jackl, Andrew

40 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Teams (PLTs) as a research-based method of improving teacher effectiveness and increasing student achievement. High Five PLT Survey results from 2007-08 through 2009-10 showed a strong level of support for the PLT oncept. The 2009-10 results revealed 73% to 92% of the respondents agreed or strongly agreed with all statements pertaining to each of the six core PLT themes. Generally, teachers responded more positively to the survey items in 2009-10 than in previous years. The percentage of teachers meeting weekly for over an hour increased greatly over prior years after implementation of the Board policy on PLTs. In short, survey results suggest strong implementation, with slow but measureable progress towards full functioning of all components of the model.

Full Report (PDF)

June 2009 PLC Survey Results by Years of Experience Baenen, Nancy

13 View Abstract

On the High Five PLC Survey, most teachers, regardless of years of experience, viewed PLCs as having a positive impact on their work environment and student learning. Beginning teachers tended to have the highest percentage of agreement. The percentage of teachers agreeing that PLCs were having the desired impact increased between 2007-08 and 2008-09 for both beginning teachers and those with more experience. Thus, trends were in the desired direction.

Full Report (PDF)

May 2009 Professional Learning Community (PLC) Implementation: WCPSS 2008-09 High Five PLC Survey Results Jackl, Andrew

37 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Communities (PLCs) as a research-based method of increasing student achievement and improving teaching effectiveness. Teachers were surveyed in 2007-08 and again in 2008-09 to obtain data about the status of PLC implementation efforts within the district. The 2008-09 results showed a strong level of support for the PLC concept (71% to 89% of the survey respondents agreed or strongly agreed with statements pertaining to each of the six core PLC themes). In most instances, teachers responded more positively to the survey items in 2008-09 than they did the year before. In short, survey results suggest that the district is making progress towards its goal of full PLC implementation.

Full Report (PDF)

February 2009 North Carolina Virtual Public School in WCPSS Update for Fall 2007, Spring 2008, and Summer 2008 Baenen, Nancy
Bulgakov-Cooke, Dina

33 View Abstract

North Carolina Virtual Public School (NCVPS) has changed since summer 2007, with more traditional courses and fewer credit-recovery courses. Total NCVPS initial enrollments of Wake County Public School System (WCPSS) students were much lower in Fall 2007 (139), Spring 2008 (198), and Summer 2008 (430) than in Summer 2007 (1,378). Students were more likely to complete courses after Summer 2007. However, students enrolled in Fall 2007 and Spring 2008 were more likely to drop courses with failure after the deadline than to do so before the cutoff date. Percentages of final enrollments with passing NCVPS course grades increased from 47% in Summer 2007 to 64%, 84%, and 70% in the fall, spring, and summer, respectively. In Summer 2008, pass rates for EOC courses were somewhat lower than for other courses, with relatively low pass rates on EOC tests.

Full Report (PDF)

October 2008 Helping High-Performing Students Achieve at Higher Levels: A Review of the Literature Yaman, Kimberly

11 View Abstract

Helping High-Performing Students Achieve at Higher Levels: A Review of the Literature

Full Report (PDF)

April 2007 Professional Learning Community (PLC) Implementation WCPSS 2006-07 Baseline Survey Results Baenen, Nancy
Reichstetter, Rosemary

21 View Abstract

Professional Learning Communities (PLCs) are being developed in the Wake County Public School System (WCPSS) to promote continuous improvement and student success. Baseline results from a 2006-07 survey show strong support for PLC concepts/expectations among school staff (at least 88% rated themes as medium or high priority), with lower implementation levels (60-73%) per theme. Sustained implementation of PLCs was reported by 24-30% of staff for each theme. Results suggest training in PLC concepts and strategies should be well received in WCPSS, and that increased implementation is clearly possible.

Full Report (PDF)

July 2005 Student Support Team Evaluation Baenen, Nancy
Harlow, Kristin2

66 View Abstract

Student Support Teams (SST) are designed to strengthen and support students who are experiencing academic, behavioral, family, and/or emotional difficulties that interfere with learning. SSTs develop and implement action plans using classroom-, school-, family-, and/or community-based strategies. In 2003-04, 80% of the 4,944 students served by SSTs were elementary students. Over half of the students referred for academic reasons scored on grade level before SST participation. Earlier SST meetings and family-based strategies were correlated with positive academic outcomes. Classroom-based strategies were correlated with fewer suspensions. Schools varied in their success in improving SST students' achievement. SST participants' growth in achievement was generally smaller than a matched comparison group over one year, but students could have differed in ways related to referral reasons. SST students closed the gap between their achievement and that of the district overall in some elementary grades but not at the secondary level.

Full Report (PDF)

October 2004 Annual Performance Report 2003-2004 Magnet Schools Assistance Program Grant Penta, Mary

146 View Abstract

The Magnet Schools Assistance Program Annual Performance Report Year 3 (2003-2004) was implemented from September 1, 2003, through August 31, 2004 in the WCPSS. Staff members implemented activities this U.S. Department of Education grant project. They built upon the foundation established in Years 1 and 2 and endeavored to fully accomplish the scope and objectives of the project by the end of Year 3. They sought to reach all performance benchmarks established for Year 3 as well as to make up for any benchmarks not fully achieved in Years 1 and 2. When senior members of the project staff realized that not every objective would be fully completed by the end of Year 3, they requested and received a no-cost extension from the MSAP office for an additional project year (September 1, 2004-August 31, 2005). Schools participating in the project and their magnet themes are: Brooks Elementary School - Museums, Joyner Elementary School - Language Explorations, Millbrook Elementary School - International Baccalaureate, Powell Elementary School - Visual and Performing Arts, and Moore Square Middle School - Museums. The project focuses on four major purposes and has objectives related to each. Annual benchmarks have been established to measure success in achieving the objectives. The four MSAP purposes are listed below, followed by a summary of accomplishments or deficits in meeting the Year 3 benchmarks for each purpose.

Full Report (PDF)

May 2004 Partnership for Educational Success 2002-03: Implementation and Outcomes Baenen, Nancy
Harlow, Kristin2

16 View Abstract

The Partnership for Educational Success (PES) is a collaboration between the Wake County Public School System (WCPSS) and Wake County Human Services. The primary goal of PES is for the agencies to work together to help students achieve grade-level performance. PES provides family-centered services to at-risk students and their families. In 2002-03 PES provided services to 269 at-risk students and their families. PES-funded staff also supported non-PES families, but no data was collected regarding these families. In 2002-03, over half of PES students scored at or above grade level before PES participation. These students may have been siblings of the primary referred students, who did score below grade level, although corroborative information is not available. Teacher survey data indicated that PES families are more involved with the school after PES participation. Test score outcomes of students in grades K-8 were inconclusive; results are similar to free and reduced-price lunch eligible students (FRL) as a whole. More data are necessary to provide a clear picture of the success of PES in meeting its academic goals.

Full Report (PDF)

February 2003 NovaNET Student Outcomes 2001-2002 Baenen, Nancy
Harlow, Kristin2

23 View Abstract

In the 2001-02 school year, NovaNET students earned significantly higher GPAs and fewer F's than before participating in NovaNET. NovaNET students did not show significantly greater gains than students in a comparison group that had similar demographic and academic characteristics; however, analyses revealed that the two groups varied somewhat in terms of prior suspensions, so results should be interpreted with caution. Some schools had much greater participation and student success than others. Strategies used by successful NovaNET programs include individualizing coursework; supplemental counseling and behavior modification; selecting the most appropriate students; requiring students to sign a contract promising to complete the course; and giving offline assignments to supplement NovaNET. Extending successful school practices to all schools could increase overall program impact.

Full Report (PDF)

July 2002 Annual Performance Report 2001-2002 Magnet Schools Assistance Program Grant Penta, Mary

123 View Abstract

In 2001-02, WCPSS Magnet Schools Assistance Program (MSAP) grant began implementation for three schools in the project and planned for two others. Schools in their first implementation year were: Joyner Elementary School, Language Explorations Millbrook Elementary School, International Baccalaureate Primary Years Programme Powell Elementary School ,Visual and Performing Arts Schools in their planning year included Brooks Elementary School ( Museums), and Moore Square Middle School ( Museums). Objective accomplishment as of the end of year 1 is described.

Full Report (PDF)