WCPSS Logo

Tag: District Improvement

Your search found 65 reports. Refine your search.

If you need assistance finding a specific report, please contact wcpss-data-accountability@wcpss.net.

Published Document Title Authors Pages Abstract
January 2019 Multi-Tiered System of Support, 2016-17 to 2017-18 Bulgakov-Cooke, Dina
Singh, Malkeet

32 View Abstract

The Multi-Tiered System of Support (MTSS) framework, which uses a systems approach to promote school improvement and support all students in improving academics and behavior using data-based problem-solving, is a key part of the Wake County Public Schools System (WCPSS) Strategic Plan. As of 2017-18, MTSS schools were at the initial stages of MTSS implementation and showed no significant improvement in Grades 3 and 8 reading proficiency, overall achievement, or Education Value-Added Assessment System (EVAAS) growth ratings that could be attributed to MTSS implementation. Suspension rates and eligibility for special education in high incidence categories were not yet a focus for the practices or professional learning and were also not positively affected by MTSS. However, a higher percentage of teachers in treatment than control elementary schools reported that MTSS positively affected student achievement in their schools. Additionally, MTSS had a positive effect on Hispanic/Latino students’ 2017-18 graduation rates and on reduction of their special education eligibility rates at elementary schools. The initial results suggest that MTSS should remain a district priority with an ongoing leadership support, expanded focus on tiered supports and on the behavioral component of MTSS.

Full Report (PDF)

October 2014 WCPSS Student Survey Results: 2013-14 Townsend, Megan

52 View Abstract

The WCPSS Student Survey is administered each year to measure students' impressions of their school and their learning experiences. 2013-14 results indicate that elementary school students had a more positive impression of their learning environment than middle or high school students. Results were similar to those of recent years except for a lower percentage of 7th and 10th grade students reporting that they are learning about other cultures and countries. Another exception was a decline in the percentage of 10th grade students agreeing that the information they are learning will help them beyond high school.

Full Report (PDF)

May 2013 High Five PLT Survey Results, 2007-08 to 2012-13 Jackl, Andrew

20 View Abstract

WCPSS PLT survey responses have been positive over time, remaining at high levels for the past six school years. Analyses of High Five PLT Survey data from 2007-08 to 2012-13 show: The percentage of positive agreement to each of the High Five PLT Survey themes increased between 4 and 11 percentage points since baseline data was first collected in the 2007-08 school year. When the survey data were disaggregated by the six PLT themes, only "collaborative culture/team processes" showed a decline (two percentage points). When the survey items are examined individually, the percentage of respondents marking that they "strongly agree" almost universally decreased from 2011-12, while the percentage marking "agree" showed a corresponding increase. Administering the High Five PLT Survey at less frequent intervals is recommended, as well as standardized PLT training for all new staff.

Full Report (PDF)

January 2013 2011-12 District Improvement Initiatives Evaluation Bulgakov-Cooke, Dina

85 View Abstract

Seven District Improvement initiatives were implemented in 2011-12 in WCPSS. All were well designed and coordinated, with common goal setting processes and use of common monitoring tools. All initiatives either met or partially met 2011-12 goals. Some were more successful in showing student outcomes, with the most positive initiatives being elementary mathematics and adolescent literacy. These results should be used to influence future decisions about continuation or strengthening of these efforts. New components that were well received and implemented by those trained (but which did not have achievement results as yet) should also be considered for future funding.

Full Report (PDF)

January 2013 WCPSS Student Survey Results: 2011-12 Baenen, Nancy
Simmons, Brandon

20 View Abstract

The overall results from the 2011-12 student survey were positive. The most positive results pertained to overall satisfaction with the participants' school, with the most unfavorable results centered on the consistency of challenging work being assigned to students and bullying. In general, 4th grade students responded more favorably than 7th and 10th grade students. Students also tended to pick the second most positive response rather than the most positive, indicating room for improvement. Items related to rigor, relevance, and relationships provided findings of interest in implementing the WCPSS strategic plan. Recommendations include improving rigor and support for student learning, considering expectations for schools with and without STEM (Science, Technology, Engineering, and Math) and Global themes for exposure to these areas, and discussing ways to address bullying in schools.

Full Report (PDF)

October 2012 WCPSS Teacher Working Conditions Survey Results: 2011-12 Halstead, Elizabeth

20 View Abstract

During the spring of 2012, over 100,000 educators across the state took the North Carolina Teacher Working Conditions (TWC) survey. WCPSS teachers responded more positively to 46 of the 85 survey items in 2012 than did teachers statewide. On 14 items, WCPSS teachers' responses were less favorable than those of teachers statewide, and on the remaining 25, there was no statistically significant difference. Results from this survey are discussed.

Full Report (PDF)

July 2012 High Five PLT Survey Results, 2007-12 Jackl, Andrew

20 View Abstract

Summary - WCPSS PLT survey responses have been positive over time, reaching a high plateau for the last three years. Analyses of High Five PLT Survey data from 2007-12 show: In 2011-12, high percentages (87.2%) of WCPSS teachers responding to the High Five PLT Survey provided positive responses to the items. Responses have been positive from 2007-08 to 2011-12, with small increases over time. Overall, WCPSS has shown an improvement in its PLT Performance Index of 5.7 percentage points over five years. The elementary, middle, and high schools have shown gains of 4.2, 7.5, and 9.1 percentage points, respectively. The implementation of dedicated time for PLT work (Wake Wednesdays) correlated to slight increases in PLT indices at the elementary and middle school levels; only the elementary level saw a slight decline when dedicated time was no longer provided.

Full Report (PDF)

April 2012 Wake County Public School System (WCPSS) Professional Learning Teams (PLTs): 2010-11 to 2011-12 School-Based Policy Study Jackl, Andrew
Lougée, Aimee

38 View Abstract

Professional Learning Teams were first introduced in WCPSS in 2003. Implementation checks, first done in 2007-08, showed most teachers (81.5%) reported involvement in PLT work. These high percentages improved slowly over time, with 87% positive responses to items by fall of 2011. In terms of impact, 81% of teachers indicated students learned more because of their PLT work. Student retention rates, classroom grades, state test performance, and graduation rates have all improved over time. Regression analyses indicated those schools who utilized PLTs the most had greater decreases in student retention rates than those with lower implementation. Similar analyses for student growth on test results just missed statistical significance. While it is difficult to separate out the impact of PLT work from other initiatives, these analyses suggest PLTs have contributed to improvements in WCPSS outcomes despite tough economic times and increasing challenges for teachers.

Full Report (PDF)

December 2011 District Improvement Outcomes: 2010-11 Paeplow, Colleen

38 View Abstract

In 2010-11, Wake County Public School System (WCPSS) was in district-wide improvement as a result of failing to meet Adequate Yearly Progress (AYP) in mathematics at the district level for the second consecutive year. This report examines overall student outcomes in 2010-11 as well as overall teacher outcomes and longitudinal results for schools targeted for three consecutive years of SIOP® training and support compared to matched schools who were not involved. SIOP® schools had a greater increase in students reaching growth targets than in the district overall. Increases in reading and mathematics proficiency at SIOP® elementary schools and reading at SIOP® middle schools were similar or slightly higher than for WCPSS. Overall mathematics results were not positive for SIOP® middle schools; however, matched school analysis by subject and school level found targeted student subgroups (i.e., Hispanic/Latino and Black/African American, Limited English Proficient, and economically disadvantaged) did benefit from attending SIOP® targeted schools. 2010-11 represented the first year of implementation of the Secondary Literacy and Secondary Mathematics Initiatives. The demographic similarity of schools implementing Secondary Mathematics with WCPSS coupled with the weak results indicates, as with Secondary Literacy, the results of this initiative could be strengthened by more selective process of targeting schools to receive training.

Full Report (PDF)

December 2011 WCPSS District Improvement Implementation 2010-11 Baenen, Nancy
Bulgakov-Cooke, Dina

94 View Abstract

Instructional strategies aimed at improving achievement of low performing student subgroups in need of support were selected by the District Improvement Advisory Committee, so that WCPSS could exit District Improvement status. Impact of each initiative, which often included teacher training and coaching is examined in this implementation report. Recommendations are made including setting strategic goals and systematically monitoring implementation; targeting schools or teachers with high numbers of AYP groups of students in need of support; being intentional in coaching efforts and structuring coaching models based on the SIOP® experience; building ownership and commitment at the school level; and coordinating new and existing efforts to optimize effectiveness.

Full Report (PDF)

August 2011 Evaluation of WCPSS Central Services Professional Learning Teams (PLTs): Spring 2011 Jackl, Andrew

39 View Abstract

The Wake County Public School System (WCPSS) Board policy indicates that central staff are to support school implementation of Professional Learning Teams (PLTs) and to participate in PLTs at the central level. Central Services supported PLT work in the schools in a variety of ways. The percentage of principals who saw this support as adequate dropped from 85% to 70% between spring 2010 and 2011. Within Central Services, 86% of survey respondents reported participating in at least one PLT. Of those responding to the Spring 2011 PLT survey, responses remained overwhelming positive about implementation and effectiveness. However, without exception, the strength of agreement decreased, with the percentage of respondents who "strongly agreed" dropping between 2010 and 2011.

Full Report (PDF)

June 2011 Outcomes for Supplemental Education Services (SES): 2009-10 Paeplow, Colleen

37 View Abstract

This report, the third of three reports examining Supplemental Education Services (SES) within the Wake County Public School System (WCPSS), focused on the long-term goal of improved student achievement by the end of the school year. In 2009-10, 508 students participated in SES at the five schools offering SES: Brentwood, Fox Road, Poe, Wendell, and York. The vast majority of students (83%) participating in SES received tutoring services in both reading and mathematics. Overall, this study did not support the value of SES in promoting higher achievement (beyond what matched students achieved).

Full Report (PDF)

April 2011 WCPSS 2010-11 High Five Professional Learning Teams (PLT) Survey Results: Implementation Over Time Jackl, Andrew

36 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Teams (PLTs) as a research-based method of improving teacher effectiveness and increasing student achievement. Over each of the last four years, a survey of educators was conducted in WCPSS and the other four High Five districts. As in previous years, this year's data showed strong support among teachers for the PLT model; between 73% and 91% of respondents indicating that they "strongly agree" or "agree" with the statements pertaining to the six PLT themes. Viewed longitudinally, positive responses for each theme have increased between four and eight percentage points since 2007-08. When 2010-11 results were compared with 2009-10, the results were less dramatic, with smaller changes in the percentage of positive responses.

Full Report (PDF)

March 2011 Implementation of Supplemental Education Services: 2009-10 Paeplow, Colleen

39 View Abstract

This report, the second of three reports examining Supplemental Education Services (SES) within WCPSS, focused on the implementation of SES, and the degree to which short-term and intermediate goals were met. In 2009-10, the SES program was largely implemented with fidelity, with some areas needing refinement related to communication and monitoring. Monitoring reports noted appropriate instruction based on learning plans was occurring. SES has 13 implementation requirements for the Local Educational Agency (7), providers (2), and parents (4). Nine were fully met, with four partially met. The two short-term goals--student enrollment in SES and providers pre-assess all participants--were met. Three of the six intermediate goals were met (progress reports given to parents, minimum of 30 hours offered to each student, monitoring showed implementation occurring) and two additional goals were partially met (attendance at SES and post-assessments given to completers).

Full Report (PDF)

February 2011 Supplemental Education Services: 2008-09 & 2009-10 Paeplow, Colleen

25 View Abstract

This report describes SES within Wake County Public School System (WCPSS) in terms of the schools, providers, and student participants in 2008-09 and 2009-10. It is the first in a series of three reports related to SES. NCLB requires schools receiving Title I funding in their second year of school improvement to offer eligible students Supplemental Educational Services (SES) in addition to existing Title I services. The SES programs for WCPSS in 2008-09 and 2009-10 were in compliance with federal guidelines to make available an SES program, enroll only FRL students, and to use state-approved vendors to deliver the program. SES is designed to improve the achievement of FRL students who score below, at, or above grade level. Therefore, service to some students may help schools reach AYP standards while service to others may help individual students and schools reach ABCs and other standards of academic success.

Full Report (PDF)

November 2010 WCPSS Professional Learning Teams (PLTs): 2009-10 School-Based Policy Implementation Study Baenen, Nancy

122 View Abstract

As a result of Board Policy 3610, PLTs were implemented across WCPSS in a consistent fashion in 2009-10. Data show that implementation improved and teachers spent more time engaged in collaborative work. School staff cited numerous benefits for teachers and students. Regression analyses showed a reasonably strong correlation between high levels of PLT implementation and students' academic achievement, attendance, and their overall level of satisfaction with their schools. Essential characteristics of PLTs were illustrated in case studies of high-performing PLTs' in the district. While collaborative cultures have been well-established, most teams could benefit from additional training on ways to use data, and on ways to evaluate the success of their efforts. Communications with school communities could also be more consistent across schools.

Full Report (PDF)

November 2010 Year 3 Magnet Schools Assistance Program Annual Progress Report Brasfield, Jon
Cárdenas, Virginia

76 View Abstract

The three MSAP schools; East Garner International Baccalaureate Magnet Middle School (EGMMS), Garner International Baccalaureate Magnet High School (GMHS), and Southeast Raleigh Leadership and Technology Magnet High School (SRMHS) showed progress on MSAP performance measures during the 3rd year of the grant. Data on 16 performance measures collected relate to "Desegregation and Choice" (6), "Building Capacity" (2), and "Academic Achievement of Students" (8). Overall, half the targets were met, with the most variability across schools for the Desegregation and Choice measures. Observations and survey results revealed increased efforts to implement innovative educational methods and programs at all three MSAP schools. Each school established strategic processes to address targets in each goal area. Although progress was made, much work remained to be done to achieve the original goals of the MSAP grant. The district requested and received a no-cost extension to run through the 2010-2011 school year.

Full Report (PDF)

September 2010 WCPSS District Improvement: 2009-10 Implementation Status Bulgakov-Cooke, Dina

46 View Abstract

In 2009-10 Wake County Public Schools System (WCPSS) exited District Improvement in reading and remained in level one for mathematics. All District Improvement efforts gained momentum. The Sheltered Instruction Observation Protocol (SIOP®) continued as the primary focus to meet the needs of limited English proficient (LEP) students in elementary and middle schools. The high school component was modified and addressed both literacy and mathematics. The number of trained SIOP® teachers considerably increased (from 588 in 2008-09 to 956 in 2009-10), follow-up coaching to support application of training reached more teachers, training implementation and buy-in strengthened. All SIOP® training, coaching, and implementation objectives for in 2009-10 were met or partially met. The number and use of SIOP® modified focus lessons increased substantially, but awareness could still be improved.

Full Report (PDF)

June 2010 Evaluation of Central Services Professional Learning Teams as of Spring 2010 Baenen, Nancy
Jackl, Andrew

35 View Abstract

The Wake County Public School System (WCPSS) board policy states that central services staff are to support school implementation of Professional Learning Teams (PLTs) and to participate in PLTs at the central level. Central staff support school efforts in a variety of ways, and over 85% of principals at each level reported this support was adequate. Participation in PLTs among central staff respondents was high for those in administrative (86%) and professional and technical roles (76%), but lower for support staff (37%). High percentages of central administrators, professionals, and technical staff had positive views about PLT implementation and impact. Responses for those in administrative roles were almost always more positive in spring 2010 than in previous surveys. High percentages of administrators and professional/technical staff believe PLTs help them perform their job more effectively, along with most support staff (91%, 86%, and 67% respectively).

Full Report (PDF)

May 2010 WCPSS 2009-10 High Five PLT Survey Results: Professional Learning Team (PLT) Implementation Over Time Jackl, Andrew

40 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Teams (PLTs) as a research-based method of improving teacher effectiveness and increasing student achievement. High Five PLT Survey results from 2007-08 through 2009-10 showed a strong level of support for the PLT oncept. The 2009-10 results revealed 73% to 92% of the respondents agreed or strongly agreed with all statements pertaining to each of the six core PLT themes. Generally, teachers responded more positively to the survey items in 2009-10 than in previous years. The percentage of teachers meeting weekly for over an hour increased greatly over prior years after implementation of the Board policy on PLTs. In short, survey results suggest strong implementation, with slow but measureable progress towards full functioning of all components of the model.

Full Report (PDF)

October 2009 Year 2 Magnet Schools Assistance Program (MSAP) Brasfield, Jon

56 View Abstract

In Year 2 of the MSAP grant, significant progress was made by each school and its community to implement the grant objectives. Year 2 represented an amalgamation of Year 1 activities that were not implemented due to a delay in hiring key personnel, original objectives assigned to Year 2, and several activities that arose from improvement sessions. Each school had a blue print that captured their performance measures, target outcomes, yearly activities, staff development activities, and resources along with a customized yearly time line. The 16 performance measures were grouped into three categories. The "Desegregation and Choice" category was the most difficult for schools to attain (with three or four of the six measures met by each school). All schools achieved both "Building Capacity" performance measures. In the "Academic Achievement" category, SRMHS achieved 5/8 targets, GMHS achieved 4/8, and EGMMS achieved 6/7 (4-year graduation rate is measured for the two high schools, but not for the middle school). In all, SRMHS achieved the stated target on 10/16 performance measures, GMHS on 10/16, and EGMMS met 12/15.

Full Report (PDF)

June 2009 PLC Survey Results by Years of Experience Baenen, Nancy

13 View Abstract

On the High Five PLC Survey, most teachers, regardless of years of experience, viewed PLCs as having a positive impact on their work environment and student learning. Beginning teachers tended to have the highest percentage of agreement. The percentage of teachers agreeing that PLCs were having the desired impact increased between 2007-08 and 2008-09 for both beginning teachers and those with more experience. Thus, trends were in the desired direction.

Full Report (PDF)

May 2009 Comprehensive List of WCPSS Programs 2008-09 Baenen, Nancy
Lougée, Aimee

90 View Abstract

WCPSS needed a consistent system for creating an inventory of programs to build capacity to evaluate all program efforts. For this inventory, "program" was defined as any planned and sustained educational effort designed to improve learning outcomes or school/classroom conditions. Overall, 29 centrally coordinated and 187 school-based programs were identified. Supports targeting academic achievement were more common than those for behavior or climate. Centrally-coordinated academic interventions at the elementary level impacted a greater number of students in literacy than in mathematics; these counts were more evenly distributed at both the middle and high school level. School-based programs tend to address literacy and mathematics at similar levels.

Full Report (PDF)

May 2009 Professional Learning Community (PLC) Implementation: WCPSS 2008-09 High Five PLC Survey Results Jackl, Andrew

37 View Abstract

The Wake County Public School System (WCPSS) continues to implement Professional Learning Communities (PLCs) as a research-based method of increasing student achievement and improving teaching effectiveness. Teachers were surveyed in 2007-08 and again in 2008-09 to obtain data about the status of PLC implementation efforts within the district. The 2008-09 results showed a strong level of support for the PLC concept (71% to 89% of the survey respondents agreed or strongly agreed with statements pertaining to each of the six core PLC themes). In most instances, teachers responded more positively to the survey items in 2008-09 than they did the year before. In short, survey results suggest that the district is making progress towards its goal of full PLC implementation.

Full Report (PDF)

May 2008 WCPSS Professional Learning Communities: 2007-08 Implementation Status Reichstetter, Rosemary

62 View Abstract

Professional Learning Communities (PLCs) are in the implementation stages throughout the Wake County Public School System (WCPSS). Results from the 2007-08 High Five PLC Survey of teachers throughout the school system, as well as observations and focus group interviews in selected schools, show that strong support continues for PLC implementation overall, (66% to 87% of respondents agreed or strongly agreed with statements about each PLC element). Results suggest PLC concepts and work efforts are well underway and are growing in implementation. Challenges cited include finding time for PLC team work and remediation of student skills, increasing the understanding of all staff of PLC concepts, and increasing teachers' skills in developing and using quality formative assessments.

Full Report (PDF)

April 2008 WCPSS High School Student Outcomes: 2006-07 Baenen, Nancy

108 View Abstract

Many indicators of performance, persistence, and academic rigor for WCPSS high school students point toward the relative success of WCPSS high school students. Student achievement remains high compared to state and national results, and an increasing number of students are pursuing rigorous AP coursework in high school. The skills and abilities that WCPSS graduates obtain appear to serve them well in the University of North Carolina (UNC) system, which is the most common educational destination for WCPSS graduates. However, changing student populations and rising academic standards are challenging the system's ability to sustain and increase academic performance for all students. Gaps in achievement have increased, with higher percentages of minority students and students with academic risk factors at risk of not graduating on time, compared to other groups.

Full Report (PDF)

April 2008 WCPSS Middle School Student Outcomes: 2006-07 McMillen, Brad

81 View Abstract

This report draws together various academic performance results for middle school students in WCPSS. Generally speaking, students in grades 6-8 continue to do well on most achievement measures, but there are significant gaps in outcomes between different student subgroups, including ethnic groups, program groups, and also between male and female students. Analysis of student outcomes is provided at the grade level as well as for subgroups. This report also describes demographic trends that impact our student outcomes as well as information about students retained in grade. Finally, the report provides summaries of several research and evaluation efforts related to effective practices for promoting student achievement.

Full Report (PDF)

April 2008 Wake County Public Schools (WCPSS) Elementary School Student Outcomes: 2006-07 Holdzkom, David

92 View Abstract

This report draws together various academic performance results for elementary students in WCPSS. Generally speaking, students in grades K-5 continue to do well on most literacy measures, but there has been a decline in mathematics EOG performance, largely resulting from the State Board of Education's action to create more rigorous cut scores for achievement levels. Analysis of student outcomes is provided at the grade level as well as for subgroups. This report describes demographic trends that impact our student outcomes as well as information about students retained in grade. Finally, the report provides summaries of several research and evaluation efforts related to effective practices for promoting student achievement.

Full Report (PDF)

February 2008 Public Issues Confronting the WCPSS Board of Education as Perceived by Focus Group Interview Participants Baenen, Nancy
Holdzkom, David

6 View Abstract

In an effort to understand the issues that the citizens of Wake County believe confront the Board of Education, two focus group interviews were conducted in November 2007 with the Community Relations Committee (CRC). The two groups both identified population growth as a major root cause of many of the issues confronting the school system. Many of the issues identified by the interviewed groups may be thought of as nested, or embedded. The focus group interviews identified three major impacts of this rapid growth on the school district: providing high quality facilities and educational programs, creating a student assignment plan that is fair and provides some measure of predictability, and coping with the increasing diversity of the student population.

Full Report (PDF)

April 2007 Professional Learning Community (PLC) Implementation WCPSS 2006-07 Baseline Survey Results Baenen, Nancy
Reichstetter, Rosemary

21 View Abstract

Professional Learning Communities (PLCs) are being developed in the Wake County Public School System (WCPSS) to promote continuous improvement and student success. Baseline results from a 2006-07 survey show strong support for PLC concepts/expectations among school staff (at least 88% rated themes as medium or high priority), with lower implementation levels (60-73%) per theme. Sustained implementation of PLCs was reported by 24-30% of staff for each theme. Results suggest training in PLC concepts and strategies should be well received in WCPSS, and that increased implementation is clearly possible.

Full Report (PDF)

March 2007 WCPSS Elementary School Student Outcomes 2005-06 Baenen, Nancy
Holdzkom, David

99 View Abstract

This report draws together various academic performance results for elementary students in WCPSS. Generally speaking, students in grades K-5 continue to do well on most literacy measures, but there has been a decline in mathematics EOG performance, largely resulting from the State Board of Education's action to create more rigorous cut scores for achievement levels. Analysis of student outcomes is provided at the grade level as well as for subgroups. This report describes demographic trends that impact our student outcomes as well as information about students retained in grade. Finally, the report provides summaries of several research and evaluation efforts related to effective practices for promoting student achievement.

Full Report (PDF)

March 2007 WCPSS Middle School Student Outcomes 2005-06 Baenen, Nancy
Holdzkom, David

84 View Abstract

This report draws together various academic performance results for middle school students in WCPSS. Generally speaking, students in grades 6-8 continue to do well on most literacy measures, but there has been a decline in mathematics EOG performance, largely resulting from the State Board of Education's action to create more rigorous cut scores for achievement levels. Results for the new test of computer skills are also a concern. Analysis of student outcomes is provided at the grade level as well as for subgroups. This report describes demographic trends that impact our student outcomes as well as information about students retained in grade. Finally, the report provides summaries of several research and evaluation efforts related to effective practices for promoting student achievement.

Full Report (PDF)

October 2006 Defining a Professional Learning Community: A Literature Review Reichstetter, Rosemary

4 View Abstract

Summarizing a nonexhaustive review of the literature, the following definition is suggested for a professional learning community: A professional learning community is made up of team members who regularly collaborate toward continued improvement in meeting learner needs through a shared curricular-focused vision. Facilitating this effort are: supportive leadership and structural conditions, collective challenging, questioning, and reflecting on team-designed lessons and instructional practices/experiences, and team decisions on essential learning outcomes and intervention/enrichment activities based on results of common formative student assessments.

Full Report (PDF)

October 2006 Effective Practices for At-Risk Elementary and Middle School Students Baenen, Nancy
Gilewicz, Ed
Ives, Sarah
Lynn, Amy
Warren, Tom
Yaman, Kimberly

72 View Abstract

The students who have the most difficulty reaching accountability standards in Wake County Public Schools are those with more than one of the following characteristics: recipients of free or reduced-price lunch, students with disabilities, and/or students with limited English proficiency. The Evaluation and Research Department identified elementary and middle schools that differed in their effectiveness in promoting achievement growth for these students. Quantitative and qualitative analyses suggest differences in both attitudes and practices. The more effective schools had higher expectations for these students, and greater confidence in their ability to meet students' needs. Evidence suggested more effective administrative leadership/support, training, and utilization of resources. Higher-growth middle schools utilized assessments to inform instruction more frequently, and higher-growth elementary schools had more structured collaboration around student needs. Further research is planned.

Full Report (PDF)

October 2006 Evaluation of Supplemental Educational Services at Hodge Road Elementary 2005-06 Paeplow, Colleen

16 View Abstract

In 2005-06, four private agencies provided 252 Hodge Road students with supplemental educational services as one component of the federal No Child Left Behind Act (NCLB). Only students receiving free or reduced-price lunch (FRL) were eligible. More than half of those served scored at or above grade level before service, while some students who scored below grade level were not eligible. The curricular materials used were remedial and not designed to extend the learning of students scoring at grade level. At grades 1-2, the percentage of students reaching grade level in literacy increased for those served; this was not the case for not-served students. Both served and not served students improved End-of-Grade (EOG) reading performance at grades 3-5. Students who had multiple risk factors (limited English proficient [LEP] or students with disabilities [SWD] in addition to FRL) showed the greatest increases in the percentage of students at grade level. A major caution when interpreting the results is that analyses could not control for other intervention efforts that may have contributed to results found.

Full Report (PDF)

July 2006 High School Redesign 2004-05 Reichstetter, Rosemary

51 View Abstract

The Wake County Public School System (WCPSS) strengthened the rigor, relevance, and relationships within its high schools in 2004-05; a primary strategy was the adoption on a block schedule. This progress report found an increase in more rigorous academic opportunities. Higher numbers of enrollees engaged in advanced courses and generally stable or higher academic success was achieved with End-of-Course exams, grade point averages, and credits earned. Greater relevance in coursework was evident and a wider variety of instructional practices. Staff promoted stronger student-staff relationships by emphasizing personalization. The majority of students and teachers reported fewer discipline concerns in classes, and students felt connected with their schools. Dropout and suspension rates did not decline.

Full Report (PDF)

December 2005 WCPSS Outcomes Summary for 2004-05, With an Emphasis on Achievement Gap Status Baenen, Nancy
Yaman, Kimberly

45 View Abstract

The Wake County Public School System (WCPSS) saw improved achievement between the late 1990s and 2003, both in overall trends and results disaggregated by subgroup. Achievement gaps began to close. The percentage of students scoring at grade level is now quite high. In the past three years, the percentage of lower income, minority, and limited-English-proficient students has increased, and the percentage of students at grade level has changed very little. Dropout and graduation rates show some closing of gaps between Black and White students, but not between Hispanic/Latino and White students. Identifying ways to further close achievement gaps and improve other student outcomes is challenging, especially in light of additional graduation requirements which will be added for students entering 9th grade in the 2006-07 school year.

Full Report (PDF)

May 2005 Student Outcomes After Reassignment for School Socioeconomic Diversity: Year Two Follow-Up Baenen, Nancy

8 View Abstract

This study examined whether reassignment, specifically when used to maintain socioeconomic diversity in WCPSS elementary schools, affects the academic outcomes of students over a two-year period. Results indicate that (1) only a small number of students in the year studied were reassigned only for diversity (with more reassigned for growth or other reasons). (2) Three-fourths of the students slated for reassignment did not attend the schools to which they had been assigned, instead choosing other options available to WCPSS students, such as magnet schools and special programs; and (3) reassigned students who did attend the schools to which they had been reassigned attained reasonable achievement in the two years following reassignment. Achievement results were mixed, with no clear advantage for either group. Only 37 students remained in their reassigned school by the end of year 2, so small sample sizes limit the generalizability of the results.

Full Report (PDF)

February 2005 Block Scheduling Evaluation Baenen, Nancy
Reichstetter, Rosemary

62 View Abstract

In 2003-04, 11 Wake County Public School System (WCPSS) high schools moved from a traditional student schedule of six full-year courses to a block schedule of four courses each semester (4x4). Implementation went fairly smoothly, with 90% of teachers trained prior to the change. Academic course opportunities and course enrollment numbers increased substantially (by 24% and 46% respectively) compared to 2002-03, key desired outcomes. Academic success was marked by increases in credits earned, grade promotion rates, and twelfth grade graduation rates as desired. Maintenance of prior status was desired for other outcomes this first year. End-of-course performance and grade point averages of 3.0 or higher actually increased slightly, while Advanced Placement (AP) scores of 3 and greater decreased slightly. Student attendance and suspension rates remained the same. Generally, most of those surveyed and interviewed expressed satisfaction with the change. Exploring modified schedule options for some courses as well as continued professional development are recommended.

Full Report (PDF)

January 2005 WCPSS K-5 Assessment Results 2003-04 Baenen, Nancy
Lindblad, Mark
Yaman, Kimberly

14 View Abstract

WCPSS uses K-5 assessments in literacy and mathematics to monitor student status in their learning, to guide instruction, and to assess whether students and schools are showing typical performance for their grade level. The percentage of students showing grade-level performance is generally between 77% and 87% on the reading and mathematics assessments. Percentages tend to be somewhat lower than those seen on the EOG tests. Increases in the percentage of students reaching grade-level standards in literacy and math at K-2 could help WCPSS reach Goal 2008 at grades 3 and up. WCPSS writing portfolios show more students scoring "at grade level" at K-2 (81%) than at grade 3-5 (62%). At grade 4, 57% of WCPSS students were considered at grade level based on local writing portfolios compared to 47.7% on the state assessment. Writing still appears to be the area where the most improvement is needed to reach state and local standards.

Full Report (PDF)

December 2004 Title V Evaluation Report 2003-04: E&R Section Page, Bethany

9 View Abstract

For the 2003-04 school year, WCPSS applied for and received Title V funding for "education reform and school improvement." WCPSS used funds to support two International Baccalaureate (IB) programs: the Middle Years Programme (MYP) at Broughton High School and the Diploma Programme (DP) at Garner Senior High School. Additional funds were used to fund a senior evaluator for school accountability to provide data to inform school improvement and student achievement. The report provides evidence of implementation and outcomes.

Full Report (PDF)

November 2004 Fast Forword Evaluation: 2003-04 Baenen, Nancy
Germuth, Amy

22 View Abstract

In 2003-04, 1,912 students in 16 elementary and 6 middle schools in the Wake County Public School System (WCPSS) participated in Fast ForWord program. Evaluation findings indicate that elementary and middle school participants made short-term gains averaging 22-55 months (approximately 2-4 years) of gain in terms of foundational listening and reading skills after nine weeks of intervention. When compared to students who had not received Fast ForWord instruction in 2003-04, both groups appeared to make similar gains on the Reading EOG over one year, although 7th and 8th graders served via Fast ForWord made greater gains on the math EOG. Over two years, students who received Fast ForWord in 2002-03 again performed similarly to their at-risk peers who had not received services in Reading EOG scores and gains. These findings suggest that Fast ForWord appears to impact foundational reading skills, but is not sufficient on its own to influence higher level reading skills and comprehension as measured by EOGs.

Full Report (PDF)

October 2004 WCPSS Outcomes Summary for 2003-04, With an Emphasis on Achievement Gap Status Baenen, Nancy
Dulaney, Chuck
Yaman, Kimberly

22 View Abstract

The Wake County Public School System (WCPSS) has seen positive changes in patterns of achievement and dropout rates over the past several years overall and by subgroup. The most positive one-year subgroup changes related to dropout rates for Black students and Adequate Yearly Progress (AYP) for minority, low-income, and limited English proficient (LEP) students. However, many achievement gaps remain, and the system continues to work towards optimal achievement for all students and closing achievement gaps.

Full Report (PDF)

June 2004 Input on 2005-06 School Calendar Survey Baenen, Nancy

20 View Abstract

The Wake County Public School System (WCPSS) Board of Education, in considering the best start date for the school calendar, questioned how important certain factors in the calendar are for high schools. If factors assumed to be important were not in fact important, a later start date would be considered. In the spring of 2004, input on the 2005-06 school calendar was secured from high school students, parents, and professional staff. In addition to rating the importance of various scheduling factors, respondents were asked to look at three specific calendars. The most popular specific option for all three groups was the calendar with the earliest start date beginning August 9, 2005, and ending May 24, 2006. About half of the parents (51%), 42% of the staff, and 34% of the students picked one of the other two options. The second-favored option overall was a start date of August 24, 2005, with a start date of September 6, 2005 selected least often. Factors most often cited in support of the August 9 start date included vacation schedules, exam completion before winter break, and the number of instructional days before Advanced Placement (AP) exams.

Full Report (PDF)

May 2004 Partnership for Educational Success 2002-03: Implementation and Outcomes Baenen, Nancy
Harlow, Kristin2

16 View Abstract

The Partnership for Educational Success (PES) is a collaboration between the Wake County Public School System (WCPSS) and Wake County Human Services. The primary goal of PES is for the agencies to work together to help students achieve grade-level performance. PES provides family-centered services to at-risk students and their families. In 2002-03 PES provided services to 269 at-risk students and their families. PES-funded staff also supported non-PES families, but no data was collected regarding these families. In 2002-03, over half of PES students scored at or above grade level before PES participation. These students may have been siblings of the primary referred students, who did score below grade level, although corroborative information is not available. Teacher survey data indicated that PES families are more involved with the school after PES participation. Test score outcomes of students in grades K-8 were inconclusive; results are similar to free and reduced-price lunch eligible students (FRL) as a whole. More data are necessary to provide a clear picture of the success of PES in meeting its academic goals.

Full Report (PDF)

April 2004 From Complacency to Excellence Through School District Reform: A Case Study of the WCPSS Banks, Karen

52 View Abstract

WCPSS has made some notable positive changes in achievement, graduation, and other outcomes over the last few years. This document summarizes trends over time in outcomes and district efforts which likely contributed.

Full Report (PDF)

April 2004 Project Achieve: Adapting the Brazosport Model to a Large LEA Baenen, Nancy
Speas, Carol

18 View Abstract

Project Achieve is a major Wake County Public School System (WCPSS) instructional initiative to improve student achievement adapted from a Brazosport, Texas model. The number of schools involved increased from 8 to 13 in 2002-03. Results were positive. All Project Achieve elementary and middle schools met the state ABCs High Growth standard both years (up from five in spring 2001), and nearly all schools increased the percent of students at or above grade level in their first year. In Year 2, compared to other WCPSS students, participation in Project Achieve was generally associated with significantly higher gains in mathematics and similar gains in reading (when background characteristics were controlled through regression analyses). Staff members also expressed more positive opinions about the academic program in their schools than in the past.

Full Report (PDF)

January 2004 Accelerated Learning Program (ALP) Grades 3-8: Evaluation 2002-03 Baenen, Nancy

36 View Abstract

The Accelerated Learning Program (ALP) began in the Wake County Public School System (WCPSS) in 1999-2000 as an out-of-school time intervention to support students scoring below grade level. Since then, flexibility in use of these funds has increased, along with the percentage of schools using the funds to support low achievers during the school day. In 2002-03, over 70% of traditional calendar schools reported providing at least a portion of their ALP services during the school day, followed by after-school sessions (about 40%), and Saturday sessions (20%). At year-round schools, intersession continues to be the most common time for ALP at the elementary (82%). However, year-round middle schools provided ALP most commonly during the school day (83%), with only 34% using intersessions. Changes in use of ALP funds have made it increasingly difficult to clearly identify which students these funds supported. Although all schools reported that students who scored below grade level were supported through ALP, data on individual students suggests that the percentage of these students in ALP declined from 59% in 2001-02 to 35% in 2002-03. The lower participation rates are partially due to under-reporting, but clearer accountability for serving students is needed.

Full Report (PDF)

January 2004 Project Achieve Evaluation: Year Two, 2002-03 Speas, Carol

38 View Abstract

Project Achieve is a major Wake County Public School System (WCPSS) instructional initiative to improve student achievement adapted from a Brazosport, Texas model. The number of schools involved increased from 8 to 13 in 2002-03. Results were generally positive. All Project Achieve elementary and middle schools met the state ABCs High Growth standard in spring 2003 (up from five in spring 2001), and 10 of 13 schools increased the percent of students at or above grade level. Compared to other WCPSS students, participation in Project Achieve was generally associated with significantly higher gains in mathematics and similar gains in reading (when background characteristics were controlled through regression analyses). Staff members also expressed more positive opinions about the academic program in their schools than in the past.

Full Report (PDF)

November 2003 Adequate Yearly Progress (AYP) Results: 2002-03 Dulaney, Chuck
Paeplow, Colleen

13 View Abstract

In the first year of implementation of the federal No Child Left Behind legislation in North Carolina, 51 of the 79 elementary schools, one of the 25 middle schools, and one of the 16 high schools in Wake County Public School System (WCPSS) met the requirements of Adequate Yearly Progress (AYP). Of the 48 Title I schools (all elementary) in WCPSS, 29 met AYP and 19 failed to meet AYP requirements. The number of reading and math AYP targets applicable to WCPSS schools ranged from eight to 32. Seven of the eight schools with 13 or fewer targets met the AYP requirements. All eleven schools with more than 25 targets failed to meet the AYP requirements. The two subgroups that most frequently failed to meet AYP were SWD (students with disabilities) and FRL (free or reduced-price lunch) students.

Full Report (PDF)

October 2003 Wake County Safe Schools/Healthy Students Grant Final Report 1999-2003 Baenen, Nancy
Harlow, Kristin2

51 View Abstract

The Safe Schools/Healthy Students Grant (SS/HS) was a three-year grant sponsored by a collaboration between the federal Departments of Health and Human Services, Juvenile Justice, and Education. The SS/HS Grant improved collaboration and communication across community agencies. During the grant period perceptions of safety improved among WCPSS students and staff, and juvenile arrests for violence and substance abuse decreased. However, school crime and violence rates, suspensions, and security violations did not decrease as hoped. Many SS/HS funded programs showed promising results, especially Teen Court (increased participation and decreased suspensions for participants) and NovaNET (80% of courses students attempted were completed successfully). Overall, SS/HS provided resources for community change, and new ideas for addressing school safety in the future.

Full Report (PDF)

September 2003 Fast ForWord Evaluation, 2002-03 Baenen, Nancy
Overbay, Amy

18 View Abstract

The 2001-02 evaluation of Fast ForWord established that participants experienced short-term gains in language and reading skills, as measured by the Woodcock Diagnostic Reading Battery. EOG results also indicated that participants made significant gains in reading achievement. This evaluation examined the reading achievement of 2002-03 Fast ForWord participants relative to a comparison group, and investigated factors that predict success on reading EOG tests. Results for 2002-03 participants indicate that participants made significant gains on EOGs, but that their achievement growth pattern was not significantly different than that of matched non-participants. The short and long versions of the Teacher Observation Survey (TOS) predicted success equally well, and no demographic characteristics predicted success consistently. Thus, no simple means of selecting the most appropriate participants were identified.

Full Report (PDF)

July 2003 Annual Performance Report 2002-2003 Magnet Schools Assistance Program Grant Penta, Mary

180 View Abstract

Magnet Schools Assistance Program Annual Performance Report Year 2 (2002-03) From September 1, 2002, through June 30, 2003, the staff members of the Wake County Public School System (WCPSS) 2001-04 Magnet Schools Assistance Program (MSAP) grant have successfully built upon the foundation they established in Year 1. This year they have endeavored to make up for any objectives not fully achieved in Year 1 and to attain all of their Year 2 objectives. Schools participating in the project and their magnet themes are: Brooks Elementary School - Museums, Joyner Elementary School - Language Explorations, Millbrook Elementary School - International Baccalaureate, Powell Elementary School - Visual and Performing Arts, and Moore Square Middle School - Museums. The project focuses on four major purposes and has objectives related to each. Annual benchmarks have been established to measure success in achieving the objectives. The four MSAP purposes are listed below, followed by a summary of accomplishments or deficits in meeting the Year 2 benchmarks for each purpose.

Full Report (PDF)

July 2003 Has ALP Helped Low-Achieving Students? Baenen, Nancy
Yaman, Kimberly

2 View Abstract

To help accomplish Goal 2003, WCPSS allocated money in 1999 for supplemental instructional support through the Accelerated Learning Program (ALP). Analyses of the program's 2001-02 results suggest that ALP was effective in promoting both achievement growth and performance at grades 3-8. ALP students showed high growth based on ABCs standards, and more than half were able to move from below to above grade level between spring 2001 and spring 2002 (compared to 38% in reading and 41% in math before ALP began).

Full Report (PDF)

May 2003 Safe Schools/Healthy Students Grant Year 4 Mid-Year Performance Report Project Status October 1, 2002 - April 30, 2003 Baenen, Nancy
Harlow, Kristin2

6 View Abstract

The Wake County Public School System (WCPSS) is currently in the extension year, or Year 4, of the Safe Schools/Healthy Students grant. This report outlines the activities continued in the extension year, and a status report on each activity for the first part of Year 4.

Full Report (PDF)

March 2003 Accelerated Learning Program (ALP): Grade 3-8 Evaluation 2001-02 Baenen, Nancy
Lindblad, Mark
Yaman, Kimberly

107 View Abstract

WCPSS initiated the Accelerated Learning Program (ALP) in 1999-2000 as the major new intervention to help all students reach grade-level performance in reading and math. Analyses of the program's third year results show that overall, changes in both achievement growth and performance support the effectiveness of ALP and other assistance at grades 3-8.

Full Report (PDF)

February 2003 Class-Size Reduction Program 2001-02 Speas, Carol

24 View Abstract

In 2001-02, 23 schools were provided with 40 teacher positions through the Class Size Reduction (CSR) Program. Achievement results for students in reduced class sizes were compared to those of similar students in other CSR schools who did not choose the same grade for the project (keeping school and student demographics similar). At grades 1 and 2, WCPSS K-2 Literacy and Mathematics Assessments were compared pre (spring 2001) and post (spring 2002). These analyses yielded mixed results: (a) an increase in the percentage of students meeting the reading-book-level standards was greater for students in the reduced-size classes at grade 2 but not at grade 1, and (b) an increase in the percentage of students meeting the mathematics standards was greater for students in the reduced-size classes at grade 1 but not at grade 2. As in the previous year at grade 3, the NC End-of-Grade fall pretest and spring post-test data indicate that, controlling for differences in pre-test scores and free and reduced-price lunch status of students, there were no significant differences in reading and mathematics achievement between students in reduced-size classes and those in regular-sized classes. As in previous years, WCPSS generally did not reach a class size of 18, the goal of the enabling legislation, and it was again recommended that schools receiving two CSR teacher positions should place two teachers at the same grade level to reduce class sizes at a single grade.

Full Report (PDF)

February 2003 NovaNET Student Outcomes 2001-2002 Baenen, Nancy
Harlow, Kristin2

23 View Abstract

In the 2001-02 school year, NovaNET students earned significantly higher GPAs and fewer F's than before participating in NovaNET. NovaNET students did not show significantly greater gains than students in a comparison group that had similar demographic and academic characteristics; however, analyses revealed that the two groups varied somewhat in terms of prior suspensions, so results should be interpreted with caution. Some schools had much greater participation and student success than others. Strategies used by successful NovaNET programs include individualizing coursework; supplemental counseling and behavior modification; selecting the most appropriate students; requiring students to sign a contract promising to complete the course; and giving offline assignments to supplement NovaNET. Extending successful school practices to all schools could increase overall program impact.

Full Report (PDF)

February 2003 Project Achieve Evaluation Report: Year One, 2001-2002 Speas, Carol

71 View Abstract

This is an evaluation of the pilot year of Project Achieve, a major local instructional initiative at six elementary schools and two middle schools to help reach the WCPSS goal of 95% of students at or above grade level. Participating schools had a higher percentage of low-income students and low-achieving students and slightly less stable student populations than the district as a whole. The initiative is based on the same principles and instructional process applied in the Brazosport, Texas school district, with modifications tailored to local needs and based on the NC Standard Course of Study. Project training and development did occur as planned from early 2001 to implementation in the 2001-02 school year. Participating schools did exceed ABCs growth and performance standards of the previous (baseline) year, as evidenced by annual NC ABCs Accountability System reports. Additionally, parents and staff expressed more positive opinions about the academic program in participating schools.

Full Report (PDF)

February 2003 Title VI: Annual Evaluation Report 2001-2002 Overbay, Amy
Speas, Carol

25 View Abstract

In the 2001-02 school year, Wake County Public School System (WCPSS) implemented a project within an innovative assistance program area of Title VI- the provision of performing arts teachers within magnet elementary schools to provide arts education - under the "promising educational reform projects" category. Twelve arts teachers, representing between 0.3 and 1.0 FTE each, served in six elementary magnet schools: Fuller, Powell, Washington, Wendell, Conn, and Wiley. Also, in spring 2001, funding was allocated for planning and training activities for a new school improvement/reorganization effort at eight schools. WPSS Instructional Services Division identified a set of six schools showing historical patterns of below-expectation growth, and two schools volunteered to participate in "Project Achieve." Training and development for the eight schools did occur as planned in July - October, 2001. Results are shared.

Full Report (PDF)

June 2002 Wake County Safe Schools/Healthy Students Project Year Three - Mid-Year Performance Report October 1, 2001 - May 31, 2002 Baenen, Nancy
Harlow, Kristin2
Overbay, Amy

41 View Abstract

The Wake County Safe Schools/Healthy Students (SS/HS) Project was a three-year federal cooperative effort sponsored by the Department of Education, the Department of Juvenile Justice, and the Department of Health and Human Services. This report focuses on year 3 results. While all students were impacted indirectly, 3,315 individual students were served directly by SS/HS intervention programs, and 16,100 students participated in group prevention activities; SS/HS disproportionately served the higher risk students in the system directly as intended. The grant had many positive benefits in Year 3. A safe school environment was promoted by security system installation, and use of the WAVE Line. Alcohol, drug, and violence prevention and early intervention programs were promoted through a Communities in Schools (CIS/CLP) mentoring program, which had a positive effect on student achievement. Teen Court expanded the number of youth served, as well as the range of programs available for those youth. In terms of school and community mental health preventive and treatment intervention services, Children of Substance Abuse (COSA) groups drastically reduced the number of students reporting that they would use violence in the future. The preschool Second Step program resulted in teachers spending less time disciplining students. Five different curricula related to SS/HS reached over 15,000 WCPSS students. NovaNET improved students' ability to pass courses and get back on track to graduation.

Full Report (PDF)

May 2002 Class-Size Reduction Program Evaluation, 2000-2001 Speas, Carol

22 View Abstract

This report examines the impact of the second year of the federal Class-Size Reduction (CSR) program in the Wake County Public School System (WCPSS) on student achievement.

Full Report (PDF)

May 2002 Title VI: Annual Evaluation Report 2000-2001 Speas, Carol

18 View Abstract

The Wake County Public School System developed a project within an innovative assistance program area of Title VI--the provision of performing arts teachers within magnet elementary schools to provide arts education--under the "promising educational reform projects" category. Funding provided to private non-profit schools was used primarily for curricular materials. In the spring of 2001, Title VI funding was allocated for planning and training activities for new school improvement/reorganization efforts at seven schools under the "3a. Promising Educational Reform Programs: Effective Schools" category. This report provides information on implementation and attainment of objectives.

Full Report (PDF)

February 2002 NovaNET 2000-2001: Analyses of Student Outcomes Relative to a Comparison Group Baenen, Nancy
Harlow, Kristin2

12 View Abstract

NovaNET is an on-line computerized instructional system that provides students with self-paced instruction for many North Carolina high school courses. This evaluation looks at outcomes for students participating in the NovaNET program and compares them with outcomes for a group of students with similar characteristics who did not participate in NovaNET. The primary positive finding was that the number of failing grades decreased significantly for students who participated in NovaNET, while a slight increase occurred for matched students. The GPA for NovaNET students showed a significant increase, but the comparison group increased about the same amount (difference between increases were not significant). NovaNET appeared to have more of a positive impact on math and social studies course grades than on English and science course grades. The pass rate for NovaNET science courses was only 50%. NovaNET did not appear to impact suspensions in 2000-2001; rates for NovaNET and matched students were statistically similar. NovaNET students were more likely to drop out of school in 2000-2001 than the comparison students who had a lower dropout rate than WCPSS overall; the change in drop-out rates should be examined again over the next few years. Overall, NovaNET seems to help students pass classes. However, more specific findings are difficult to obtain due to the newness of the program, and the difficulty of creating an accurately matched comparison group.

Full Report (PDF)

February 2002 The Accelerated Learning Program (ALP) 2000-01: Student Participation and Effectiveness Baenen, Nancy
Lindblad, Mark
Yaman, Kimberly

71 View Abstract

The Accelerated Learning Program (ALP) is the major initiative that the Wake County Public School System (WCPSS) is using to help all students reach grade level performance in reading and math. In 2000-01, ALP's second year of implementation, the program expanded from grades 3-8 to K-12. This report focuses on student participation rates and the impact of the ALP program.

Full Report (PDF)